Constraints On Dates (feature)

From UG

Revision as of 18:33, 13 January 2010 by Alex (Talk | contribs)
Jump to: navigation, search


Contents

Parent Mantis

1670

Business Need

We have a number of constraints / validation rules that we need to enforce for dates.

Requirements

All detailed requirements have been translated into specifications - see below.

Technical Specification

Summary

Type constraints on dates:


Chronological Constraint

All dates can be listed in a chronological order. Given date on the list can be equal or be a later date chronologically than any previous date on the list:

cc1 <= cc2 <= ...

If order is incorrect then system must present pop-up:

In CT#XXX, date <date name> can not be <earlier/later> than date <date name>" [OK].

See per MOT lists below.

Chronological Constraint: AIR CT

 [cc1] [I] [----------------] (Act) Created on Date
 [cc2] [I] [----------------] (Act) Notification Date
 [cc3] [I] [----------------] (Act) Authorized on Date

 [cc4] [I] [COLLECTION EVENT] (Est / Act) Pick-up date 
 [cc5] [M] [DEPARTURE EVENT ] (Est / Act) Airport of Departure Date
 [cc6] [M] [ARRIVAL EVENT   ] (Est / Act) Airport of Discharge Date
 [cc7] [I] [DELIVERY EVENT  ] (Est / Act) Delivery Date 


Chronological Constraint: AIR Master

[cc1] [M] [DEPARTURE EVENT ] (Act) Airport of Departure Date
[cc2] [M] [ARRIVAL EVENT   ] (Act) Airport of Discharge Date

Chronological Constraint: OCEAN CT


[cc1] [I] [----------------] (      Act) Created on Date
[cc2] [I] [----------------] (      Act) Notification Date
[cc3] [I] [----------------] (      Act) Authorized on

[cc4] [I] [COLLECTION EVENT] (Est / Act) Pick-up date (for FCL, see Note)

[cc5] [I] [DEPARTURE EVENT ] (Est / Act) Origin Terminal
[cc6] [M] [--------------- ] (Est / Act) Port Of Loading
[cc7] [M] [----------------] (Est / Act) Port Of Discharge
[cc8] [I] [ARRIVAL EVENT   ] (Est / Act) Destination Terminal

[cc9] [I] [DELIVERY EVENT  ] (Est / Act) Delivery Date (for FCL, see Note)


Chronological Constraint: OCEAN Master

[cc1] [I] [DEPARTURE EVENT ] (Est / Act) Origin Terminal
[cc2] [M] [--------------- ] (Est / Act) Port Of Loading
[cc3] [M] [----------------] (Est / Act) Port Of Discharge
[cc4] [I] [ARRIVAL EVENT   ] (Est / Act) Destination Terminal

TBD: what to do with container dates for Master???


Chronological Constraint: TRUCK-AIR CT

[cc1] [I] [----------------] (      Act) Created on Date
[cc2] [I] [----------------] (      Act) Notification Date
[cc3] [I] [----------------] (      Act) Authorized on

[cc4] [I] [COLLECTION/DEPARTURE EVENT] (Est / Act) Pick-up date 
[cc5] [I] [ARRIVAL/DELIVERY EVENT    ] (Est / Act) Delivery Date 

Chronological Constraint: TRUCK-DOM CT

[cc1] [I] [----------------] (      Act) Created on Date
[cc2] [I] [----------------] (      Act) Notification Date
[cc3] [I] [----------------] (      Act) Authorized on

[cc4] [I] [COLLECTION/DEPARTURE EVENT] (Est / Act) Pick-up date 
[cc5] [I] [ARRIVAL/DELIVERY EVENT    ] (Est / Act) Delivery Date 

Chronological Constraint: TRUCK-OCEAN CT


[cc1] [I] [----------------] (      Act) Created on Date
[cc2] [I] [----------------] (      Act) Notification Date
[cc3] [I] [----------------] (      Act) Authorized on

[cc4] [I] [COLLECTION/DEPARTURE EVENT](Est / Act) Pick-up date (for FCL, see Note)
[cc5] [I] [ARRIVAL/DELIVERY EVENT    ](Est / Act) Delivery Date (for FCL, see Note)

Chronological Constraint: TRUCK MASTER

TRUCK MASTER has no dates.

Note About FCL

In case of FCL there are multiple Pick-up and Delivery Dates (per container). No order between them is enforced.

Non Empty Prerequisite Constraint

There is a natural sequence of pre-requisites (defined per MOT). Field later in the sequence can not be defined until all earlier fields are defined.

field 1 --> field 2 --> ...

If order is incorrect then system must present pop-up:

In CT#XXX, field <field name> must be set before field <field name> is set" [OK].

See per MOT definitions below.


Non Empty Prerequisite Constraint: AIR CT


[field 1] [M] [----------------] Master Airway Bill #
[field 2] [M] [DEPARTURE EVENT ] (Act) Airport of Departure Date
[field 3] [M] [ARRIVAL EVENT   ] (Act) Airport of Discharge Date
[field 4] [I] [DELIVERY EVENT  ] (Act) Delivery Date 

Non Empty Prerequisite Constraint: OCEAN CT

[field 1] [----------------] At least one container#
[field 2] [I] [DEPARTURE EVENT ] (Est / Act) Origin Terminal
[field 3] [I] [ARRIVAL EVENT   ] (Est / Act) Destination Terminal
[field 4] [I] [DELIVERY EVENT  ] (Est / Act) Delivery Date (FCL: on any container)

Contents Constraint

Contents Constraint: OCEAN CT and TRUCK OCEAN CT

All contents must be assigned to containers before "(Act) Delivery Date" is set

If it is not true then system must present pop-up:

All contents must be assigned to containers before "(Act) Delivery Date" is set [OK].

Functionality: Required Pre-condition Constraint

The following validation must be implemented "on Save":

LCL / FCL

a) Issue error pop-up if “actual departure date” (Origin Terminal) is entered but there is no “container number” (not even one container exists).

b) Issue error pop-up if “actual arrival date” (Destination Terminal) is entered but there is no “actual departure date” (Origin Terminal).

c) Issue error pop-up if “delivery date” is entered (FCL:on ANY container) but there is no “actual arrival date” (Destination Terminal) set.

d) Issue error pop-up if “delivery date” is entered (FCL:on ANY container) but there is at least one line in commodity table unassigned.

AIR

a) Issue error pop-up if “actual departure date” (Airport of Departure) is entered but there is no “Master Air Waybill #”.

b) Issue error pop-up if “actual arrival date” (Airport of Destination) is entered but there is no “actual departure date” (Airport of Departure)

c) Issue error pop-up if “delivery date” is entered but there is no “actual arrival date” (Airport of Destination) set.

d) Issue error pop-up if “delivery date” is entered (FCL:on ANY container) but there is at least one line in commodity table unassigned.


TRUCK-AIR

TBD!!!

TRUCK-OCEAN

TBD!!!

TRUCK-DOM

TBD!!!

Examples of wording for Error Messages

Ocean:

“A container number must be entered before the actual departure date can be confirmed”

“The actual departure date must be confirmed before the actual arrival date can be confirmed”

“The actual arrival date must be confirmed before the actual delivery date can be confirmed”

Air:

“A MAWB number must be entered before the actual departure date can be confirmed”

“The actual departure date must be confirmed before the actual arrival date can be confirmed”

“The actual arrival date must be confirmed before the actual delivery date can be confirmed”

Functionality: Actual Date Can Not Be A Future Date Constraint

If user is trying to set any actual dates (see below) to the future date system must issue pop up: "Error while saving: <name of the date> can not be in the future [OK]".

List of actual dates in the system

UNDEF:

  • Gentab.Actual export pickup

Truck-Dom:

  • Gentab.Actual export pickup
  • Gentab.Actual Delivery

Truck-Air:

  • Gentab.Actual export pickup
  • Gentab.Actual Delivery

Truck-Ocn:

  • Conttab.Containers.ContainerX.Actual collection
  • Conttab.Containers.ContainerX.Actual Delivery

AIR:

Gentab:

  • Actual export pickup

Exptab:

  • Airport of Departure. ATD
  • Trans-shipment Airport.ATD
  • Airport Of Destination. ATD

ImpTab:

  • Actual Delivery Date

LCL:

Gentab:

  • Actual export pickup

Exptab:

  • Origin Terminal ATD
  • Port Of Loading ATD
  • Port Of Trans-shipment ATA
  • Port Of Discharge ATA
  • Destination Terminal ATA

ImpTab:

  • Actual Delivery Date


FCL:

Conttab.Containers:

  • ContainerX.Actual collection
  • ContainerX.Actual Delivery

Exptab:

  • Origin Terminal ATD
  • Port Of Loading ATD
  • Port Of Trans-shipment ATA
  • Port Of Discharge ATA
  • Destination Terminal ATA

Special case: CTs under Groups and Masters

In this case change to one date field can be applied to multiple CTs potentially breaking date constraints on multiple records.

In this case system must verify all related records and display error that spells out WHAT dates on WHAT records are breaking WHAT constraint.

User Interface

There is no UI here except some pop-up messages.

Point in Time When Data is Tested against Constraints

Ideally this should happen real-time any time date is entered. But because of a glitch in a framework (or lack of our knowledge of workaround) we can only test it "on Save".


Figures

Figure: XXX

RFC

1) Do you clear invalid values after error pop up is generated?

Yes you should clear these values. Now system does not.

Good idea?

2) Idea: have in Admin option to turn any validation.

Option for what records to turn off.

Good idea? How hard?

3) Functionality: Required Pre-condition Constraint

Should we add to d) condition "or commodity table is empty"

4) Should we re-design in terms of "CT consistent/ inconsistent state" because for example if user assign all commodities and then set Actual Deliv date BUT later unassign it gives you "strange message":

"Actual Delivery date can not be assigned - all commodity items must be assigned to containers"

It is better to say like this: "Inconsistent State: Actual Delivery date assigned but at least one commodity item is unassigned."

History

Old spec archived

It is CT Dates

Spec created

--Alex 20:01, 12 January 2010 (UTC)

0001324: (Constraints On Dates) Display error that spells out WHAT dates on WHAT records are breaking WHAT constrain

--Alex 20:01, 12 January 2010 (UTC)

Known Non Critical Bugs

bug1) error is not specific to what date in what CT there is a problem

bug2) even if problem with ordering of actual dates system complains about "estimated"

DB

Personal tools