Constraints On Dates (feature)

From UG

Revision as of 21:31, 11 January 2010 by Alex (Talk | contribs)
Jump to: navigation, search


Contents

Parent Mantis

tbd

Business Need

We have a number of constraints / validation rules that we need to enforce for dates.

Requirements

All detailed requirements have been translated into specifications - see below.

Technical Specification

Summary

List of constraints on dates:

User Interface and Functionality

List of dates in their Natural Order

AIR:


[no1] [I] [----------------] (      Act) Created on Date
[no2] [I] [----------------] (      Act) Notification Date
[no3] [I] [----------------] (      Act) Authorized on

[no4] [I] [COLLECTION EVENT] (Est / Act) Pick-up date 

[no5] [M] [DEPARTURE EVENT ] (Est / Act) Airport of Departure 

[no6] [M] [----------------] (Est / Act) Trans-shipment Airport 

[no7] [M] [ARRIVAL EVENT   ] (Est / Act) Airport of Discharge 

[no8] [I] [----------------] (      Act) Customs Status Date 
[no9] [I] [----------------] (      Act) FDA Status Date 

[no10][I] [DELIVERY EVENT  ] (Est / Act) Delivery Date 


LCL/FCL:


[I] [----------------] (      Act) Created on Date
[I] [----------------] (      Act) Notification Date
[I] [----------------] (      Act) Authorized on

[I] [COLLECTION EVENT] (Est / Act) Pick-up date, Container 1 
[I] [COLLECTION EVENT] (Est / Act) Pick-up date, Container 2 (FCL only)
... 
[I] [COLLECTION EVENT] (Est / Act) Pick-up date, Container N (FCL only)

[I] [DEPARTURE EVENT ] (Est / Act) Origin Terminal
[M] [--------------- ] (Est / Act) Port Of Loading
[M] [----------------] (Est / Act) Port Of Trans-shipment
[M] [----------------] (Est / Act) Port Of Discharge
[I] [ARRIVAL EVENT   ] (Est / Act) Destination Terminal

[I] [----------------] (      Act) Customs Status Date 
[I] [----------------] (      Act) FDA Status Date 

[I] [DELIVERY EVENT  ] (Est / Act) Delivery Date, Container 1 
[I] [DELIVERY EVENT  ] (Est / Act) Delivery Date, Container 2 (FCL only) 
...
[I] [DELIVERY EVENT  ] (Est / Act) Delivery Date, Container N (FCL only) 

Order Constraint Based On Shipment's Path

"On save" check the following rules. See #List of dates in their Natural Order.

1) Starting from the top of the list. Dates can be “same day” moving down, but a date cannot be “before” a date located “above”.

2) On the same level (actual and estimated) ther is no rule"

Actual Date Can Not Be A Future Date Constraint

If user is trying to set any actual dates (see below) to the future date system must issue pop up: "Error while saving: <name of the date> can not be in the future [OK]".

List of actual dates in the system

UNDEF:

  • Gentab.Actual export pickup

Truck-Dom:

  • Gentab.Actual export pickup
  • Gentab.Actual Delivery

Truck-Air:

  • Gentab.Actual export pickup
  • Gentab.Actual Delivery

Truck-Ocn:

  • Conttab.Containers.ContainerX.Actual collection
  • Conttab.Containers.ContainerX.Actual Delivery

AIR:

Gentab:

  • Actual export pickup

Exptab:

  • Airport of Departure. ATD
  • Trans-shipment Airport.ATD
  • Airport Of Destination. ATD

ImpTab:

  • Actual Delivery Date

LCL:

Gentab:

  • Actual export pickup

Exptab:

  • Origin Terminal ATD
  • Port Of Loading ATD
  • Port Of Trans-shipment ATA
  • Port Of Discharge ATA
  • Destination Terminal ATA

ImpTab:

  • Actual Delivery Date


FCL:

Conttab.Containers:

  • ContainerX.Actual collection
  • ContainerX.Actual Delivery

Exptab:

  • Origin Terminal ATD
  • Port Of Loading ATD
  • Port Of Trans-shipment ATA
  • Port Of Discharge ATA
  • Destination Terminal ATA

Entities and Attributes

Special Cases and Misc

Look And Feel

Figures

Figure: XXX

History

Non Critical Bugs and RFC

bug1) error is not specific to what date in what CT there is a problem

bug2) even if problem with ordering of actual dates system complains about "estimated"