2413 rfsa
From UG
Contents |
General Info
Dates on CT2 are supposed to be confirmed in the specific orders.
Business Requirements
- Operator should not be allowed to enter dates in incorrect orders. If a date is entered out of the order, system should show an error message and the date should not be saved.
- These dates are under different tabs per mode of transportation.
Detail Requirements
- NOTE: Each date below MUST be entered in order as the following order dates below.
- Example: MOT: Ocean LCL, Destination Terminal ATA date cannot be entered before Port of discharge ATA date is entered. And Port of discharge ATA cannot be entered before Port of Tranship ATA date is entered (if this date is application),...etc
MOT:Ocean LCL
Notification Date
- Mapping: CT_bo#Notification_Date
- Logic: This date MUST be set before any other dates
Authorized on
- Mapping CT_bo#Authorized_On
- Logic: This date CANNOT be set until the Notification date has been sent
Export pick up actual date
Origin Terminal actual ATD
Port of loading actual ATD
Port of Tranship ATA (if applicable)
Port of discharge ATA
Destination Terminal ATA
delivery date