2413 rfsa

From UG

(Difference between revisions)
Jump to: navigation, search
(MOT:Ocean LCL)
(MOT:Ocean LCL)
Line 23: Line 23:
:* Mapping [[CT_bo#Authorized_On]]
:* Mapping [[CT_bo#Authorized_On]]
:* Logic: This date CANNOT be set until the previous date has been set
:* Logic: This date CANNOT be set until the previous date has been set
 +
:** Authorized on date cannot be set if Notification date is empty
 +
:** Authorized on date set cannot be before Notification date set
 +
:** Authorized on date set can be the same date as Notification date
'''Export pick up actual date'''
'''Export pick up actual date'''
Line 32: Line 35:
:** Export pick up actual date can be set the same day as Authorized on date
:** Export pick up actual date can be set the same day as Authorized on date
-
'''Origin Terminal actual ATD'''
+
'''Origin Terminal ATD'''
:* Mapping [[CT_bo#Origin_Terminal_Actual_Date]]
:* Mapping [[CT_bo#Origin_Terminal_Actual_Date]]
:* Logic:  This date CANNOT be set until the previous three dates have been set
:* Logic:  This date CANNOT be set until the previous three dates have been set
-
:* Origin Terminal Actual ATC cannot be set if Export Pick up actual date is empty.
+
:* Origin Terminal ATD cannot be set if Export Pick up actual date is empty.
 +
:** Origin Terminal ATD cannot be before Export pick up actual date set
 +
:** Origin Terminal ATD can be the same date as the Export pick up date
-
'''Port of loading actual ATD'''
+
 
 +
'''Port of loading ATD'''
:* Mapping [[CT_bo#Port_Of_Loading_Actual_Date]]
:* Mapping [[CT_bo#Port_Of_Loading_Actual_Date]]
:* Logic:  This date CANNOT be set until the previous four dates have been set
:* Logic:  This date CANNOT be set until the previous four dates have been set
 +
:** Port of loading ATD Cannot be set if Origin terminal ATD is empty
 +
:** Port of loading ATD cannot be before Origin terminal ATD set
 +
:** Port of loading ATD can be the same date as the Origin terminal ATD
'''Port of Tranship ATA''' (if applicable)  
'''Port of Tranship ATA''' (if applicable)  
:* Mapping [[CT_bo#Trans_Shipment_Actual_Date]]
:* Mapping [[CT_bo#Trans_Shipment_Actual_Date]]
:* Logic:  This date CANNOT be set until the previous five dates have been set
:* Logic:  This date CANNOT be set until the previous five dates have been set
 +
:** Port of Transship ATA Cannot be set
 +
:** Port of Transship ATA Cannot be set if Port of loading ATD is empty
 +
:** Port of Transship ATA cannot be before Port of loading ATD set
 +
:** Port of Transship ATA can be the same date as the Port of loading ATD set
'''Port of discharge ATA'''
'''Port of discharge ATA'''
:* Mapping [[CT_bo#Port_Of_Discharge_Actual_Date]]
:* Mapping [[CT_bo#Port_Of_Discharge_Actual_Date]]
:* Logic:  This date CANNOT be set until the previous six dates have been set
:* Logic:  This date CANNOT be set until the previous six dates have been set
 +
:** Port of discharge ATA Cannot be set if Port of Transship ATD or Port of loading ATD is empty
 +
:** Port of discharge ATA Cannot be set before Port of transship or Port of loading set
 +
:** Port of discharge ATA can be the same date as the Port of transship or Port of loading set
'''Destination Terminal ATA'''
'''Destination Terminal ATA'''
:* Mapping [[CT_bo#Destination_Terminal_Actual_Date]]
:* Mapping [[CT_bo#Destination_Terminal_Actual_Date]]
:* Logic:  This date CANNOT be set until the previous seven dates have been set
:* Logic:  This date CANNOT be set until the previous seven dates have been set
 +
:** Destination Terminal ATA
 +
:** Destination Terminal ATA
 +
:** Destination Terminal ATA
 +
'''Delivery date'''
'''Delivery date'''

Revision as of 18:49, 3 November 2010


Contents

General Info

Dates on CT2 are supposed to be confirmed in the specific orders.


Business Requirements

  • Operator should not be allowed to enter dates in incorrect orders. If a date is entered out of the order, system should show an error message and the date should not be saved.
  • These dates are under different tabs per mode of transportation.


Detail Requirements

  • NOTE: Each date below MUST be entered in order as the following order dates below.
  • Example: MOT: Ocean LCL, Destination Terminal ATA date cannot be entered before Port of discharge ATA date is entered. And Port of discharge ATA cannot be entered before Port of Tranship ATA date is entered (if this date is application),...etc


MOT:Ocean LCL

Notification Date

Authorized on

  • Mapping CT_bo#Authorized_On
  • Logic: This date CANNOT be set until the previous date has been set
    • Authorized on date cannot be set if Notification date is empty
    • Authorized on date set cannot be before Notification date set
    • Authorized on date set can be the same date as Notification date

Export pick up actual date

  • Mapping CT_bo#Estimated_Export_Pick_Up_Date
  • Logic: This date CANNOT be set until the previous two dates have been set
  • NOTE: When Export pick up can be set.
    • Export pick up actual date cannot be set if Authorized on date is empty
    • Export pick up actual date set cannot be before Authorized on date set
    • Export pick up actual date can be set the same day as Authorized on date

Origin Terminal ATD

  • Mapping CT_bo#Origin_Terminal_Actual_Date
  • Logic: This date CANNOT be set until the previous three dates have been set
  • Origin Terminal ATD cannot be set if Export Pick up actual date is empty.
    • Origin Terminal ATD cannot be before Export pick up actual date set
    • Origin Terminal ATD can be the same date as the Export pick up date


Port of loading ATD

  • Mapping CT_bo#Port_Of_Loading_Actual_Date
  • Logic: This date CANNOT be set until the previous four dates have been set
    • Port of loading ATD Cannot be set if Origin terminal ATD is empty
    • Port of loading ATD cannot be before Origin terminal ATD set
    • Port of loading ATD can be the same date as the Origin terminal ATD

Port of Tranship ATA (if applicable)

  • Mapping CT_bo#Trans_Shipment_Actual_Date
  • Logic: This date CANNOT be set until the previous five dates have been set
    • Port of Transship ATA Cannot be set
    • Port of Transship ATA Cannot be set if Port of loading ATD is empty
    • Port of Transship ATA cannot be before Port of loading ATD set
    • Port of Transship ATA can be the same date as the Port of loading ATD set

Port of discharge ATA

  • Mapping CT_bo#Port_Of_Discharge_Actual_Date
  • Logic: This date CANNOT be set until the previous six dates have been set
    • Port of discharge ATA Cannot be set if Port of Transship ATD or Port of loading ATD is empty
    • Port of discharge ATA Cannot be set before Port of transship or Port of loading set
    • Port of discharge ATA can be the same date as the Port of transship or Port of loading set

Destination Terminal ATA

  • Mapping CT_bo#Destination_Terminal_Actual_Date
  • Logic: This date CANNOT be set until the previous seven dates have been set
    • Destination Terminal ATA
    • Destination Terminal ATA
    • Destination Terminal ATA


Delivery date

MOT:Ocean FCL

Notification date

Authorized on

  • Mapping CT_bo#Authorized_On
  • Logic: This date CANNOT be set until the previous date has been set

Actual collection

Actual delivery

Origin terminal ATD

Port of loading ATD

Port of tranship (if applicable) ATA

Port of discharge ATA

Destination terminal ATA

MOT:Air

Notification date

Authorized on

  • Mapping CT#Authorized_On
  • Logic: This date CANNOT be set until the previous dates have been set

Actual Export Pick-Up Date

Airport of departure actual time of departure

Trans-shipment Airport actual time of arrival

Airport of destination actual time of arrival

Actual delivery Date or delivery comment

Personal tools