2413 rfsa

From UG

(Difference between revisions)
Jump to: navigation, search
(Detail Requirements)
Line 20: Line 20:
'''Authorized on'''
'''Authorized on'''
-
 
+
:* Mapping [[CT_bo#Authorized_On]]
 +
:* Logic: This date CANNOT be set until the Notification date has been sent

Revision as of 20:03, 2 November 2010


Contents

General Info

Dates on CT2 are supposed to be confirmed in the specific orders.

Business Requirements

  • Operator should not be allowed to enter dates in incorrect orders. If a date is entered out of the order, system should show an error message and the date should not be saved.
  • These dates are under different tabs per mode of transportation.

Detail Requirements

  • NOTE: Each date below MUST be entered in order as the following order dates below.
  • Example: MOT: Ocean LCL, Destination Terminal ATA date cannot be entered before Port of discharge ATA date is entered. And Port of discharge ATA cannot be entered before Port of Tranship ATA date is entered (if this date is application),...etc


MOT:Ocean LCL

Notification Date


Authorized on

  • Mapping CT_bo#Authorized_On
  • Logic: This date CANNOT be set until the Notification date has been sent


Export pick up actual date


Origin Terminal actual ATD


Port of loading actual ATD


Port of Tranship ATA (if applicable)


Port of discharge ATA


Destination Terminal ATA


delivery date


MOT:Ocean FCL

MOT:Air

Personal tools