Constraints On Dates (feature)
From UG
(Difference between revisions)
(Created page with 'Category:Ops == Parent Mantis == [http://mantis.jaguarfreight.com/mantis/view.php?id=tbd tbd] == Business Needs and Requirements == == Technical Specification == === Summa…') |
(→Business Needs and Requirements) |
||
Line 5: | Line 5: | ||
[http://mantis.jaguarfreight.com/mantis/view.php?id=tbd tbd] | [http://mantis.jaguarfreight.com/mantis/view.php?id=tbd tbd] | ||
- | == Business | + | == Business Need == |
+ | |||
+ | There is a natural "sequence of dates". For example date of departure of a vessel can not be later than date of arrival of this vessel. | ||
+ | |||
+ | It is important to prevent operator from making error. | ||
+ | |||
+ | |||
+ | == Requirements == | ||
+ | |||
+ | All detailed requirements have been translated into specifications - see below. | ||
+ | |||
== Technical Specification == | == Technical Specification == | ||
=== Summary === | === Summary === |
Revision as of 15:49, 11 January 2010
Contents |
Parent Mantis
Business Need
There is a natural "sequence of dates". For example date of departure of a vessel can not be later than date of arrival of this vessel.
It is important to prevent operator from making error.
Requirements
All detailed requirements have been translated into specifications - see below.