Internal Dashboard Reports (concepts and requirements) (OLD spec)

From UG

(Difference between revisions)
Jump to: navigation, search
(Scheduled Reports)
 
(95 intermediate revisions not shown)
Line 1: Line 1:
-
[[Category:Projects]]
+
[[Category:Action Required DRs]]
== Info ==
== Info ==
-
Project Mantis: 0002572: [Dashboard Reports] .....<proj>
+
Project Mantis: 0002488: [KPI]......... <proj>
-
== Business requirements ==
+
<font color="red">!!! This wiki was originally written by Tracie. After she completed it Alex split content into 2 wikis - see links below.</font>
-
'''Core Business Need:'''  This is a change for all of the internal scheduled ops reports.  To change from being e-mailed to being on internal users home page.
+
==  Business Analysis and Requirements ==
 +
see below
-
=== Scheduled Reports ===
+
== Requirements for any report ==
 +
See [[DR framework for Action Required reports]] (content has been moved)
-
* [[#Impending_Departures_Report]]
+
== Requirements for specific reports ==
-
* [[#Incomplete_Report]]
+
=== Specific Dashboard Reports ===
-
Instead of being a scheduled report, Mo would like each of these to be a dashboard item that can be linked to an individuals profile.
+
See [[DR for 9 existing Action Required internal reports]]

Current revision as of 23:34, 29 September 2011


Contents

[edit] Info

Project Mantis: 0002488: [KPI]......... <proj>

!!! This wiki was originally written by Tracie. After she completed it Alex split content into 2 wikis - see links below.

[edit] Business Analysis and Requirements

see below

[edit] Requirements for any report

See DR framework for Action Required reports (content has been moved)

[edit] Requirements for specific reports

[edit] Specific Dashboard Reports

See DR for 9 existing Action Required internal reports

Personal tools