2413 rfsa
From UG
(→MOT:Ocean LCL) |
|||
(24 intermediate revisions not shown) | |||
Line 1: | Line 1: | ||
- | [[Category: | + | [[Category:RFSA]] |
- | = | + | <div style="background-color:lightSteelBlue"> |
- | + | ||
+ | == Parent Mantis == | ||
- | + | 0002413: [Nov Dec Twks] Date Validation | |
- | + | ||
- | + | ||
+ | 0001670: (Feature: Constraints On Dates) .....................<parent> | ||
- | == | + | ==Info== |
- | + | ||
- | + | ||
+ | Dates should be confirmed in the specific sequence and in chronological order. | ||
- | + | Dates can be confirmed the using same as or after the previous date entered. | |
+ | == Requirements == | ||
- | + | System should not allow dates to be confirmed out of this specified order. If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved. | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
+ | *The error message should indicate the details of the error (what date is causing the error) | ||
+ | **Example: Actual arrival date cannot be confirmed until actual departure date has been confirmed. | ||
+ | **Example 2: Actual delivery date cannot be confirmed until actual departure and actual arrival dates have been confirmed. | ||
- | + | The system must allow each of the dates to be the same as the previous date. | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
+ | ===FCL shipments=== | ||
+ | Notification date | ||
- | + | Actual collection date | |
- | + | *Only required to be filled in if an estimated collection date is filled in | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
+ | Origin terminal actual date | ||
+ | *Only required if radio button is set to yes indicating the origin terminal is different from the port of loading | ||
- | + | Port of loading actual date | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
+ | Port of trans-ship actual date | ||
+ | *Only if check box is checked indicating this record has a trans-shipment point | ||
- | + | Port of discharge actual date | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
+ | Destination terminal actual date | ||
+ | *Only if radio button is set to yes indicating the destination terminal is different than the port of discharge | ||
- | + | Actual delivery date or delivery comment | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
+ | ===LCL shipments=== | ||
+ | Notification date | ||
- | + | Actual export pickup Date | |
- | + | *Only if the estimated export pickup date is entered | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
+ | Origin terminal actual date | ||
+ | *Only if radio button is set to yes indicating it would differ from Port of Loading actual date | ||
- | + | Port of loading actual date | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | Port of trans-ship actual date | |
+ | *Only if check box is checked indicating this record has a trans-shipment point | ||
- | + | Port of discharge actual date | |
- | + | ||
- | + | ||
- | + | Destination terminal actual arrival date | |
- | + | *Only if radio button is set to yes indicating the destination terminal is different than the port of discharge | |
- | + | ||
- | + | Actual delivery date or delivery comment | |
- | + | ||
- | + | ||
- | + | ===Air=== | |
- | + | Notification date | |
- | + | ||
- | + | Actual export pickup date | |
- | + | *Only if the estimated export pickup date is entered | |
- | + | ||
- | + | Airport of departure actual time of departure | |
- | + | ||
- | + | ||
- | + | Trans-shipment airport actual time of departure | |
- | + | *Only if check box is checked indicating this record has a trans-shipment point | |
- | + | ||
- | + | Airport of destination actual time of arrival | |
- | + | ||
- | + | ||
- | + | Actual delivery date or delivery comment | |
- | + | ||
- | + | ||
- | === | + | ===Estimated dates=== |
- | + | ||
- | + | ||
- | + | ||
- | + | A conflict between estimated dates and actual dates should not cause an error message – the actual dates can be before or after the estimated dates. | |
- | + | ||
- | + | ||
- | + | Validations of estimated dates are no longer required. Estimated dates should be for information purposes only. | |
- | + | ||
- | + | ||
- | + | • Exception to the above is the estimated export pick up date. Only to be used as an indicator that the system should be requiring an actual export pickup date. | |
- | + | ||
- | + | ||
- | |||
- | |||
- | |||
- | + | </div> | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + |
Current revision as of 21:27, 27 January 2011
Contents |
[edit] Parent Mantis
0002413: [Nov Dec Twks] Date Validation
0001670: (Feature: Constraints On Dates) .....................<parent>
[edit] Info
Dates should be confirmed in the specific sequence and in chronological order.
Dates can be confirmed the using same as or after the previous date entered.
[edit] Requirements
System should not allow dates to be confirmed out of this specified order. If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved.
- The error message should indicate the details of the error (what date is causing the error)
- Example: Actual arrival date cannot be confirmed until actual departure date has been confirmed.
- Example 2: Actual delivery date cannot be confirmed until actual departure and actual arrival dates have been confirmed.
The system must allow each of the dates to be the same as the previous date.
[edit] FCL shipments
Notification date
Actual collection date
- Only required to be filled in if an estimated collection date is filled in
Origin terminal actual date
- Only required if radio button is set to yes indicating the origin terminal is different from the port of loading
Port of loading actual date
Port of trans-ship actual date
- Only if check box is checked indicating this record has a trans-shipment point
Port of discharge actual date
Destination terminal actual date
- Only if radio button is set to yes indicating the destination terminal is different than the port of discharge
Actual delivery date or delivery comment
[edit] LCL shipments
Notification date
Actual export pickup Date
- Only if the estimated export pickup date is entered
Origin terminal actual date
- Only if radio button is set to yes indicating it would differ from Port of Loading actual date
Port of loading actual date
Port of trans-ship actual date
- Only if check box is checked indicating this record has a trans-shipment point
Port of discharge actual date
Destination terminal actual arrival date
- Only if radio button is set to yes indicating the destination terminal is different than the port of discharge
Actual delivery date or delivery comment
[edit] Air
Notification date
Actual export pickup date
- Only if the estimated export pickup date is entered
Airport of departure actual time of departure
Trans-shipment airport actual time of departure
- Only if check box is checked indicating this record has a trans-shipment point
Airport of destination actual time of arrival
Actual delivery date or delivery comment
[edit] Estimated dates
A conflict between estimated dates and actual dates should not cause an error message – the actual dates can be before or after the estimated dates.
Validations of estimated dates are no longer required. Estimated dates should be for information purposes only.
• Exception to the above is the estimated export pick up date. Only to be used as an indicator that the system should be requiring an actual export pickup date.