2413 rfsa

From UG

(Difference between revisions)
Jump to: navigation, search
Line 25: Line 25:
'''Export pick up actual date'''
'''Export pick up actual date'''
-
 
+
:* Mapping [[CT_bo#Estimated_Export_Pick_Up_Date]]
 +
:* Logic: This date CANNOT be set until the previous two dates have been sent
'''Origin Terminal actual ATD'''
'''Origin Terminal actual ATD'''
-
 
+
:* Mapping [[CT_bo#Origin_Terminal_Actual_Date]]
 +
:* Logic:  This date CANNOT be set until the previous three dates have been sent
'''Port of loading actual ATD'''
'''Port of loading actual ATD'''
 +
:* Mapping [[CT_bo#Port_Of_Loading_Actual_Date]]

Revision as of 20:07, 2 November 2010


Contents

General Info

Dates on CT2 are supposed to be confirmed in the specific orders.

Business Requirements

  • Operator should not be allowed to enter dates in incorrect orders. If a date is entered out of the order, system should show an error message and the date should not be saved.
  • These dates are under different tabs per mode of transportation.

Detail Requirements

  • NOTE: Each date below MUST be entered in order as the following order dates below.
  • Example: MOT: Ocean LCL, Destination Terminal ATA date cannot be entered before Port of discharge ATA date is entered. And Port of discharge ATA cannot be entered before Port of Tranship ATA date is entered (if this date is application),...etc


MOT:Ocean LCL

Notification Date


Authorized on

  • Mapping CT_bo#Authorized_On
  • Logic: This date CANNOT be set until the Notification date has been sent


Export pick up actual date

Origin Terminal actual ATD

Port of loading actual ATD


Port of Tranship ATA (if applicable)


Port of discharge ATA


Destination Terminal ATA


delivery date


MOT:Ocean FCL

MOT:Air

Personal tools