2413 rfsa

From UG

(Difference between revisions)
Jump to: navigation, search
(Detail Requirements)
(MOT:Ocean LCL)
Line 12: Line 12:
'''Notification Date'''
'''Notification Date'''
:* Mapping: [[CT_bo#Notification_Date]]
:* Mapping: [[CT_bo#Notification_Date]]
-
 
+
:* Logic: This date MUST be set before any other dates
'''Authorized on'''
'''Authorized on'''
Line 35: Line 35:
'''delivery date'''
'''delivery date'''
-
 
=== MOT:Ocean FCL ===
=== MOT:Ocean FCL ===

Revision as of 19:40, 2 November 2010


Contents

General Info

Dates on CT2 are supposed to be confirmed in the specific orders.

Business Requirements

  • Operator should not be allowed to enter dates in incorrect orders. If a date is entered out of the order, system should show an error message and the date should not be saved.
  • These dates are under different tabs per mode of transportation.

Detail Requirements

MOT:Ocean LCL

Notification Date

Authorized on


Export pick up actual date


Origin Terminal actual ATD


Port of loading actual ATD


Port of Tranship ATA (if applicable)


Port of discharge ATA


Destination Terminal ATA


delivery date

MOT:Ocean FCL

MOT:Air

Personal tools