CT2 Resources Demand Supply Allocation
From UG
This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.
We need to build smart Supply Chain for CT2! ))
Contents |
Metrics
ftl
ftl - full time load
Assumptions:
- 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one full time employee
The following metrics are suggested:
- 1 ftl (high/full load)
- if average numb of hours required per week is 30-40
- 3/4 ftl (med load)
- if average numb of hours required per week is 20-30
- 1/2 ftl (low load)
- if average numb of hours required per week is 10-20
- 1/4 ftl (very low load)
- if average numb of hours required per week is 0-10