CT Dates
From UG
Contents |
Intro
This article covers:
- Common CT dates logic
- CT Dates Tab in CT profile
Ver 1.1
- ss1 // p3low // add validation to all delivery dates: Actual delivery date(s) cannot be in the future. They can only be “today” or “in the past”. (If today is jan 2 2009 and I set this date today I can not set it to any date before that)
Ver 1.2
- ss1 // Error pop-up we have now "Invalid ordering of dates" must clearly state what dates and in what CTs/Master have conflict. Right now it is very hard to find out when you get this error while changing date in Master Details Tab and that master have 10 CTs.
Ver 1.3
- ss1 // for LCL:
- Block user from changing "ImpTab. Actual Delivery Date (LCL)" if there is at least one line in commodity table unassigned.
- ss2 // for FCL:
- Block user from changing "Container Panel.Actual Delivery date" (FCL) from empty to something for ANY container on container panel if there is at least one line in commodity table unassigned.
- ss3 // pop up text:
"Actual Delivery date can not be assigned - all commodity items must be assigned to containers"
(This is done because every commodity line must be a part of some container before it is delivered)