International Portal Solution
From UG
Contents |
Info
- Related mantis#:
- 0002629: [Intl Portal] ... <proj>
- 0002892: [Intl Portal] Implement phase 1
Implementation
Phase 1
May-Jul Sprint
- Admin panel for Shipper Role.
- Added Mode Of Transport list to Shipper profile in Admin Panel.
- Added prototype of Shipment Field access rights Admin Panel
- Started implementation of flexible Shipment Editor. Shipment Editor should looks similar to Internal Application Shiment Editor
- Implemented base set of field editors (Gen Tab)
- Started Dims Table editor on Cont Tab of editor
- Shipment List for Shipper/Planner role
- Created Mode of Transport column
- Sorting and Filter by Mode of Transport feature
- Creation, Cloning, Editing shipments of any Transport Mode allowed to Shipper
NOTE: currently all these features were implemented as prototype.
Jul-Aug Sprint (Plan)
- Shipment Editor
- complete all MOT specific fields editors for Air and Ocean Transport Modes on Imp and Exp Tabs
- Implement dynamic switching allowed fields according to current Shipper (Planner) field access rights
Aug-Sept Sprint (Plan)
- Planner Role
- implement Field Access admin panel for Planner role
- support Approval Process for any type of MOT
- selecting MOT for shipments
TBD
Phase 2
Figures
Figure 1. Admin panel for Shipper Role.
Figure 2. Admin panel. Shipper Role edit window.
Figure 3. Admin panel. Shipment Field access rights window.
Figure 4. Shipment List for Shipper role.
Figure 5. Client Shipment Editor. Gen Tab.
Figure 6. Client Shipment Editor. Cont Tab.
Implementation Notes
Pre Implementation Architect Notes
Written by Architect after previous section is completed.
Implementation Notes
To be written by Developer or BA by the time UAT is completed. Briefly defines what was implemented and how.
Post Implementation Architect Notes
Written by Architect after previous section is completed.