2011 May Sprint
From UG
Contents |
Info
Sprint Info Start: May 30 Mon Staging: July 4 Mon Prod: July 7 Thu Days in Kiev 25 Days in NY: 24 Holidays: 1 (Troica) PTO:
Mantises:
- 0002963: [* Dev Sprint-2011-05 (May)] http://ct.jaguarfreight.com/mantis/view.php?id=2963
- developer's plans: 2883, 2885, 2886, 2887
Dev Plan
See mantis.
Dev Sprint updates
Notes
Major projects as defined for CT2 Board of Directors
- 1. Dashboard Reports/KPIs
- in Development stage
- Phase 1 to be delivered:
- Cost Per Pound external KPI
- Past Due Arrivals internal KPI
- possibly proof of concept/limited functionality for one more KPI (Average Times)
- 2. Rates DB
- in Development stage
- Phase 1 to be delivered. Includes:
- Database structure (core)
- Rates editor/viewer (simple version)
- 3. International Portal
- in Development stage
- Phase 1 to be delivered. Includes:
- Database structure (core)
- Extended shipper role (covers additional MOTs Air and Ocean)
- 4. Smartphone Application
- in Business Analysis stage
- Detailed Business requirements to be delivered
- in Business Analysis stage
Release schedule:
- July 7
- August 18
Business processes defined in this Sprint
WU info
"WU Info" is a type of mantis note that contains information that:
- was missing in spec and needs to be added during WU phase (type: add) OR
- should replace some existing info in spec (type: replace) OR
- should be deleted from spec (type: delete)
Example:
WU Info (type: add) ------------------- .... Write text here .... .... Write text here .... .... Write text here ....
This info will be found by engineer who is responsible by Wiki Updates and and applied to spec in WU phase.
WU Backlog
This is a new project added as a last phase. We need this to separate tasks that came to WU from current Sprint from tasks that are waiting for WU since previous Sprints
Change from UAT to UAT/RN
Phase UAT was renamed into UAT/RN to reflect the fact that during that phase BAs are also responsible to create RN (Release note) for every mantis to be released.
Release Notes
Release Note (for specific mantis or feature) is a summary (1-3 paragraphs) of info to be included into Release Notes and explains to end user what is this feature/bugfix/tweak/etc is about. This was requested by Simon.
See new format for RN here:
RN is to be posted into mantis note (see example below). This will be collected by Support Engineer, assembled into RN and passed to Sys Admin to include to "New Release" message at the time of release.
RN: --- .... Write text here .... .... Write text here .... .... Write text here ....
Proto phase and proto field
This is a new phase added for new components build without detailed designs. Before sending finalized feature to QA developer he will submit prototype to BA.
This task is to be assigned be assigned to QA with proto field set to Y.
QA is to deploy this and to move to Proto folder and assign to BA.
See also diagram.
Completed tasks is to be deployed to Demo by QA daily
TBD
Pre-Implementation and Post-Implementation Notes
In cases when design is not well defined Pre-Implementation Notes have to be posted into mantis before coding.
Post-Implementation Notes should be submitted as required before Proto and QA. Possible reasons: additional info is required to be able to do Proto and QA (info is missing or some changes have been introduced).
Example (note 0009982 from 0003041: [Rates DB] (MOT Air) (ph1) Implement Contract Upload feature):
Pre-Implem Notes ---------------- Upload procedure: 1. User selects a menu item Acc/Rate Contracts/Rate Contract’s Upload 2. There will be preliminary form which user should fill before chosing the file with Rate Contract 3. In this form user should indicate a. Name of contract b. Airline or JaguarVendor for which the contract will be uploaded c. Comments for this contract (optionally) d. ChargeCode for this contract (one) e. Included ChargeCodes for this contract (multiply) 4. After filling this form user clicks button “Chose Contract Rate file” choses file and clicks button “Upload” 5. System will automatically update RateDatabase according to this file 6. First level of automatically updating Database will be only for one format of RateContracts files
Post-Implem Notes ----------------- .... Write text here .... .... Write text here .... .... Write text here ....