Cost per pound analysis
From UG
Contents |
Cost per pound KPI
Formulas
Cost per pond for load = (cost of load) / (weight of load in pounds)
Average Estimated Cost Per Pound of Arden Domestic Trucking Operation in November = Cost of all loads handled in November / total weight of these loads
Average Estimated Cost Per Pound of YRC in November = Cost of all loads handled in November by YRC / total weight of these loads