2413 rfd

From UG

Revision as of 22:34, 31 January 2011 by Andrei (Talk | contribs)
Jump to: navigation, search


Contents

Info

  • mantis 0002413: [Ops Misc Dates] Date Validation

Requirements and Solutions

  • Task type: Tweak.
  • Where: Actual CT Dates.
  • What: System should validate the chronological order in the specific sequence for all actual dates.
    • The system must allow each of the dates to be the same as the previous date or more.
    • If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved.
      • Text of message: <Next date> cannot be confirmed until <previous date> has been confirmed.
      • Example: Actual arrival date cannot be confirmed until actual departure date has been confirmed.
    • NOTE: Validations of estimated dates are no longer required.

Details

  • Specific sequence of validating dates is conditioned on the set of events the shipment.
  • Each event corresponds to the date of shipment depending on the mode of transport:

FCL shipments

LCL shipments

Air shipments

Trucking shipments

NOTE: Validations of Trucking CT dates will be specified later in separate mantis.

Architect Review

Implementation Notes

QA Plan

History

Personal tools