AN ORIGINAL KPIs for OpsTruck (concepts and requirements)

From UG

Revision as of 17:52, 22 November 2010 by Alex (Talk | contribs)
Jump to: navigation, search


Contents

Parent Mantis

2488: [Arden KPI]......... <proj>

Requirements

There are number of reports required. See below.

The concept is to make them layered: to start at a top level and be able to drill down to more finite details.

Design Ideas

Cost per pound analysis

See Cost per pound analysis

Total cost analysis

See Total cost analysis

Average times

See Average times

Maps

See Maps

History

Original ver

http://mantis.jaguarfreight.com/mediawiki-1.15.0/index.php?title=BI_and_KPIs_for_OpsTruck&oldid=16496

Personal tools