2565 rfsa

From UG

Revision as of 20:43, 17 November 2010 by Alex (Talk | contribs)
(diff) ← Older revision | Current revision (diff) | Newer revision → (diff)
Jump to: navigation, search


Contents

PARENT MANTIS

0002515: [Estim P&L] .......<proj>

REQUIREMENTS

Core: Enable accounting to “close out” the month end, at the actual end of each month, based on estimated charges. In order to achieve this, we will require operators to enter estimated sales and costs at the required point of recognition (TBD).


Estimated Cost

should reflect:

  • Dollar Amount
  • Vendor
  • Currency
  • Charge Code
  • Charge Code Description

Estimated Sell

should reflect:

  • Bill To Party
  • Dollar amount
  • Currency


DESIGN IDEAS

These charges will be entered in on a separate Tab Est., as per examples

Once these charges are entered into this Estimation invoice – It should then pull through and show on the P/L tab.


DETAILED DESIGN

HISTORY

Personal tools