Cargo Due Date Feature

From UG

Revision as of 16:16, 13 September 2011 by Denise (Talk | contribs)
Jump to: navigation, search


Contents

Info

  • parent: 0002539: [OSDS] ..... <proj>

Glossary

Business Needs

Core need

This feature would allow for better optimization, by knowing the number of days to put off picking up shipments; to be able to add more pickups, in the future, to maximize the trucks capacity.

Requirements

This date feature should not be hard coded; it should be allowed to be managed in CT2 >> Admin >> Client App Admin - TMS tab, as an option to display or not to display. (This would be to allow for the scalability of our current TMS solution, for us to provide to other client companies.)

  • This feature is for Non Jag users that have role, Planner set in their non jag user profile - see Cybertrax_2.1_Client_(requirements)#Core_Planner_Functionality.
    • If Non Jag user has planner role with Cargo Due Date Field on, AND Double Approval Process = basic planner, this date field is mandatory and must be completed .
    • Also, the system should prevent non jag users with basic planner role from changing the Cargo Due Date set by super planner.
    • If Non Jag user has planner role with Cargo Due Date Field on, And Double Approval Process = super planner role, this date field is also mandatory and must be completed. But they also can confirm the date that was already set by basic planner, by approving and/or placing on hold with an approved for pickup date. They do not need to reset the date value, unless its in the past.
  • This date needs to be sent to the TMS on the Shipment Import File. (xml mapping, see Data Dic mapping here 2229)
  • Allow the Approved for date to the same as the cargo due date, but it cannot be in the past.
  • This date will also be required for KPI reporting/analysis.
    • Avg Time KPIs

Functionality

  • Provide option to turn on/off the Cargo Due Date Field on each planner role.
  • This cargo due date field is a Datebox

Cybertrax_2.1_Client_(requirements)#Hold_With_Approved_For_Pick_Up_On_Date_Status.

Solution Provided

Summary

Cargo Due Date feature is entered to allow better optimization of truck utilization. It is a last possible date of shipment delivery and allows to Jaguar operator to know how long can be delayed shipment.

It is "PO issued by" specific. Showing the Cargo Due Date is an option for every "PO issued by" and can be managed from Admin section. It can be switched on/off only for double approval CT process which implies approving from Regular Planner and SuperPlanner. For single approval the showing of Cargo Due is not needed.

Admin part

"PO issued by" management panel

"PO issued by" admin section contains a list of Companies that considered as "PO issued by".

  • For every "PO Issued by" can be set type of approval process (single or double).
  • For every company with double approving "Cargo Due Date" feature can be switched on/off.
    • 8/24 Change = Add On/Off switch for "Cargo Due Date" feature for single approval process planner users

File:Cargo Due Date PO Issued By.JPG

Click to Approval Status File:Cargo Due Date Popup 1.JPG

Click to set Cargo Due Date File:Cargo Due Date Popup 2.JPG

Where and when to add Cargo due datebox

Planner is a such user that can work with Cargo Due Date feature. So Non-Jaguar user should get Planner role and also should have a list of selected "PO Issued By". Planner can be assigned as Super Planner for "PO issued by" with double approval process.

Please note that check box will be unchecked and read only (grayed out) if "PO issued by" is associated with "Single approval" process.

Super Planner Role File:Non Jag User Profile for Super Planner.JPG

Basic Planner Role File:Non Jag User Profile for Basic Planner.JPG

Client part

Add field at the point of setting status (planner user)

Cargo Due Date must be set during approval CT process which can be performed through:

  • change CT status from any status to Approve status
  • change CT status from any status to Hold with Approved for Pick Up On Date status

File:CargoDueDate_ApprovalComment.jpg

Becomes Read only for Basic planer after Super updated

Must be in Log

  • Individual CT records updates log
  • Shipper/Planner History log

Must appear on reports and xls download

  • xls downl for list CTs, planner role
  • KPIs (future)
  • anything else? - Yes
    • In Transit Report - Add to list of Output
    • Main Report - Add to list of Output
    • TDS http://ct.jaguarfreight.com/internal/Index.zul#reportsTDSForm (as filters/columns)? - Both filters & columns
      • Filters - add Date range for Cargo Due
      • Columns - Add Header named Due Date, place in between "Appr on Date" & "Pickup Location". List on ALL 3 Tabs (Approved, Routed & Picked Up) with the date values set by planner user, if no value, leave blank

Date range validation

x? < date < y?

Cybertrax_2.1_Client_(requirements)#Hold_With_Approved_For_Pick_Up_On_Date_Status

When super planner sets status to basic planner records that have date values in the past

This date Must visible / editable on appropriate CT details panels

Read only:

  • Client role, (?) Not yet approved for client role
  • Shipper role - on CT Shipment View (see IE below)
  • Planner role - On CT Shipment Vie (see IE below)

File:Shipper and Planner View IE.JPG

Editable:

  • operator role (internal) (until CT has load assigned)
  • basic planner (until status set to Approved or date is changed by Super)
  • super planner (until status set to Approved)

Integration with Descartes

  • Earliest & Latest Delivery Date = Cargo due date with time window from 9am to 5pm.
    • There is no need to increase the # of days to this date as it is a date that says that cargo cannot be delivered any later than that date set.
  • The TMS will consider the latest delivery date when creating the load and use that as the estimated delivery date for cargo.
  • It is ok to deliver before the Cargo Due Date it is NOT ok deliver after the cargo due date.

Cargo due date sent to TMS

File:TMS Shipment view with Cargo Due Date.JPG

History

0002295 [TMS (OSDS)] (Cargo Due Date) Add this feature & date fields to CT2 internal & client app shipper/planner view

WU? In progress --Denise 12:46, 23 August 2011 (EDT)

0003002 [TMS (OSDS)] (Cargo Due Date) Add cargo due date to shipment import under xml attribute EarliestDelDate & LatestDelDate

WU? Yes

Suggested Solution

Summary

Cargo Due Date feature is entered to allow better optimization of truck utilization. It is a last possible date of shipment delivery and allows to Jaguar operator to know how long can be delayed shipment.

It is "PO issued by" specific. Showing the Cargo Due Date is an option for every "PO issued by" and can be managed from Admin section. It can be switched on/off only for double approval CT process which implies approving from Regular Planner and SuperPlanner. For single approval the showing of Cargo Due is not needed.

Admin part

"PO issued by" management panel

"PO issued by" admin section contains a list of Companies that considered as "PO issued by".

  • For every "PO Issued by" can be set type of approval process (single or double).
  • For every company with double approving "Cargo Due Date" feature can be switched on/off.

File:CargoDueDate_POIssuedBy.jpg

File:CargoDueDatePopup1.jpg

File:CargoDueDatePopup2.jpg

Where and when to add Cargo due datebox

Planner is a such user that can work with Cargo Due Date feature. So Non-Jaguar user should get Planner role and also should have a list of selected "PO Issued By". Planner can be assigned as Super Planner for "PO issued by" with double approval process.

Please note that check box will be unchecked and read only (grayed out) if "PO issued by" is associated with "Single approval" process.

File:CargoDueDate_NonJagUser.jpg

Client part

Add field at the point of setting status (planner user)

Cargo Due Date must be set during approval CT process which can be performed through:

  • change CT status from any status to Approve status
  • change CT status from any status to Hold with Approved for Pick Up On Date status

File:CargoDueDate_ApprovalComment.jpg

Becomes Read only for Basic planer after Super updated
Must be in Log
  • Individual CT records updates log
  • Shipper/Planner History log
Must appear on reports and xls download
  • xls downl for list CTs, planner role
  • KPIs (future)
  • anything else? - Yes
    • In Transit Report - Add to list of Output
    • Main Report - Add to list of Output
    • TDS http://ct.jaguarfreight.com/internal/Index.zul#reportsTDSForm (as filters/columns)? - Both filters & columns
      • Filters - add Date range for Cargo Due
      • Columns - Add Header named Due Date, place in between "Appr on Date" & "Pickup Location". List on ALL 3 Tabs (Approved, Routed & Picked Up) with the date values set by planner user, if no value, leave blank
Date range validation

x? < date < y?

Cybertrax_2.1_Client_(requirements)#Hold_With_Approved_For_Pick_Up_On_Date_Status

Not Correct "Mandatory to set for basic but not for super" Changed 8/18 to Mandatory for both

This was not correct: Note: in this case some CTs will have empty date (if super approves without setting this date before basic does anything).

8/18 this is feature mandatory for both basic & super planner users.

If non jag user who has planner role with Cargo Due Date field on, then show this field when planner sets approval status to:

  • Cybertrax_2.1_Client_(requirements)#Approve_Status OR
  • Cybertrax_2.1_Client_(requirements)#Hold_With_Approved_For_Pick_Up_On_Date_Status
This date Must visible / editable on appropriate CT details panels

Read only:

  • Client role, (?) Not yet approved for client role
  • Shipper role - on CT Shipment View (see IE below)
  • Planner role - On CT Shipment Vie (see IE below)

File:Shipper and Planner View IE.JPG

Editable:

  • operator role (internal) (until CT has load assigned)
  • basic planner (until status set to Approved or date is changed by Super)
  • super planner (until status set to Approved)
Not Correct "Mandatory to set for basic but not for super" Changed 8/18 to Mandatory for both

Editing of this spec was done after release as we found a spec bug. It was corrected by developer Andriy under mantis 3147

This was not correct: Note: in this case some CTs will have empty date (if super approves without setting this date before basic does anything).

8/18 this is feature mandatory for both basic & super planner users.

If non jag user who has planner role with Cargo Due Date field on, then show this field when planner sets approval status to:

  • Cybertrax_2.1_Client_(requirements)#Approve_Status OR
  • Cybertrax_2.1_Client_(requirements)#Hold_With_Approved_For_Pick_Up_On_Date_Status