This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.
We need to build smart Supply Chain for Software Development! ))
Contents |
Metrics
There are 2 types of activities:
- continuous: bugfix, tweaking (small to medium changes)
- projects
ftl
It is proposed to use ftl (full time load) unit of measurement. This is to measure demand for IT staff (SAs, BAs, developers, QAs, Support Engineers).
Assumptions:
- One full time employee works 8 m/h a day ~ 40 m/h a week ~ 160 m/h a month
- One Sprint ~ One month
The following metrics are suggested:
full load
- 1 ftl (full load)
- if average numb of hours required: 30 to 40 per week ~ 120-160 per month
medium load
- 3/4 ftl (med load)
- if average numb of hours required: 20 to 30 per week ~ 80-120 per month
low load
- 1/2 ftl (low load)
- if average numb of hours required: 10 to 20 per week ~ 40-80 per month
very low load
- 1/4 ftl (very low load)
- if average numb of hours required: 1 to 10 per week ~ 4-40 per month
2010 June to December Forecast
Existing modules
Acc Component
- continuous bug-fix/tweaking:
- emh low = 5 per week
- emh high = 10 per week
- project 1) Re-design cost mapping and P&L for CTs, Groups, Masters
- emh = TBD
- deadline: asap
- project 2) see Category:Salesman
- emh = TBD
- deadline: asap
Client Component
- continuous bug-fix/tweaking:
- emh low = 10 per week
- emh high = 30 per week
- project 1) see #0001707 Replace Skype with our own Instant Messaging feature
- emh = TBD
- deadline: asap
- project 2) see #0001999 Create Agent Interface component/application
- emh = TBD
- deadline: asap
Ops Component
- continuous bug-fix/tweaking:
- emh low = 10 per week
- emh high = 30 per week
- projects: TBD
- emh = TBD
Ops Pdfs Component
- continuous bug-fix/tweaking:
- emh low = 10 per week (will be getting lower soon)
- emh high = 20 per week (will be getting lower soon)
- projects: TBD
- emh = TBD
Ops Reps Component
- continuous bug-fix/tweaking:
- emh low = 10 per week (will be getting lower soon)
- emh high = 30 per week (will be lower if no new reports requested)
- projects: #0001998 Have all CT fields available on all CT reports
- emh = TBD
New Modules
Integration with TMS
Trucking Domestic Optimization
Rates Interface
EDI
Inventory Management
www.jaguarfreight.com website re-design
Etc
Misc
Development based on Requirements not Detailed Design
2 possible options:
- Remote Developer (programmer) creates detailed design based on requirements
- Remote Designer creates detailed design based on requirements
Both options would increase numb of hours required in Remote Team