CT2 Resources Demand Supply Allocation
From UG
(Difference between revisions)
(→Metrics) |
(→2010 June to December Forecast) |
||
Line 48: | Line 48: | ||
==== Acc Component ==== | ==== Acc Component ==== | ||
- | * ''continuous | + | * ''continuous bug-fix/tweaking:'' |
- | ** emh = | + | ** emh low = 5 per week |
+ | ** emh high = 10 per week | ||
* project 1) Re-design cost mapping and P&L for CTs, Groups, Masters | * project 1) Re-design cost mapping and P&L for CTs, Groups, Masters | ||
Line 61: | Line 62: | ||
==== Client Component ==== | ==== Client Component ==== | ||
- | * ''continuous | + | * ''continuous bug-fix/tweaking:'' |
** emh = 10-20 per week | ** emh = 10-20 per week | ||
Line 82: | Line 83: | ||
==== Ops Pdfs Component ==== | ==== Ops Pdfs Component ==== | ||
- | * ''continuous | + | * ''continuous bug-fix/tweaking:'' |
** emh = 10-20 per week | ** emh = 10-20 per week | ||
==== Ops Reps Component ==== | ==== Ops Reps Component ==== | ||
- | * ''continuous | + | * ''continuous bug-fix/tweaking:'' |
** emh = when new reports are required then 20-30 per week else 10-20 per week | ** emh = when new reports are required then 20-30 per week else 10-20 per week | ||
Revision as of 17:18, 17 May 2010
This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.
We need to build smart Supply Chain for Software Development! ))
Contents |
Metrics
There are 2 types of activities:
- continuous: bugfix, tweaking (small to medium changes)
- projects
ftl
It is proposed to use ftl (full time load) unit of measurement. This is to measure demand for IT staff (SAs, BAs, developers, QAs, Support Engineers).
Assumptions:
- One full time employee works 8 m/h a day ~ 40 m/h a week ~ 160 m/h a month
- One Sprint ~ One month
The following metrics are suggested:
full load
- 1 ftl (full load)
- if average numb of hours required: 30 to 40 per week ~ 120-160 per month
medium load
- 3/4 ftl (med load)
- if average numb of hours required: 20 to 30 per week ~ 80-120 per month
low load
- 1/2 ftl (low load)
- if average numb of hours required: 10 to 20 per week ~ 40-80 per month
very low load
- 1/4 ftl (very low load)
- if average numb of hours required: 1 to 10 per week ~ 4-40 per month
2010 June to December Forecast
Existing modules
Acc Component
- continuous bug-fix/tweaking:
- emh low = 5 per week
- emh high = 10 per week
- project 1) Re-design cost mapping and P&L for CTs, Groups, Masters
- emh = TBD
- deadline: asap
- project 2) see Category:Salesman
- emh = TBD
- deadline: asap
Client Component
- continuous bug-fix/tweaking:
- emh = 10-20 per week
- project 1) see #0001707 Replace Skype with our own Instant Messaging feature
- emh = TBD
- deadline: asap
- project 2) see #0001999 Create Agent Interface component/application
- emh = TBD
- deadline: asap
Ops Component
- continuous support/tweaking:
- emh = 10-20 per week
- project 1) ...
- emh = TBD
Ops Pdfs Component
- continuous bug-fix/tweaking:
- emh = 10-20 per week
Ops Reps Component
- continuous bug-fix/tweaking:
- emh = when new reports are required then 20-30 per week else 10-20 per week
New Modules
Integration with TMS
Trucking Domestic Optimization
Rates Interface
EDI
Inventory Management
www.jaguarfreight.com website re-design
Etc
Development based on Requirements not Detailed Design
2 possible options:
- Remote Developer (programmer) creates detailed design based on requirements
- Remote Designer creates detailed design based on requirements
Both options would increase numb of hours required in Remote Team