CT2 Resources Demand Supply Allocation
From UG
(Difference between revisions)
(→Metrics) |
|||
Line 7: | Line 7: | ||
== Metrics == | == Metrics == | ||
- | === | + | === ftl === |
+ | |||
+ | ftl - full time load | ||
Assumptions: | Assumptions: | ||
- | * 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one '''full time | + | * 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one '''full time employee''' |
The following metrics are suggested: | The following metrics are suggested: | ||
- | * 1 | + | * 1 ftl (high/full load) |
:: if average numb of hours required per week is 30-40 | :: if average numb of hours required per week is 30-40 | ||
- | * 3/4 | + | * 3/4 ftl (med load) |
:: if average numb of hours required per week is 20-30 | :: if average numb of hours required per week is 20-30 | ||
- | * 1/2 | + | * 1/2 ftl (low load) |
:: if average numb of hours required per week is 10-20 | :: if average numb of hours required per week is 10-20 | ||
- | * 1/4 | + | * 1/4 ftl (very low load) |
:: if average numb of hours required per week is 0-10 | :: if average numb of hours required per week is 0-10 | ||
- | |||
- | + | == 2010 June to December Forecast == | |
+ | === Existing modules === | ||
+ | ==== Acc Component ==== | ||
- | == | + | ==== Client Component ==== |
- | + | ==== Ops Component ==== | |
- | === | + | ==== Ops Pdfs Component ==== |
- | === | + | ==== Ops Reps Component ==== |
- | === | + | === New Modules === |
- | === | + | ==== Trucking Domestic Optimization ==== |
- | === | + | ==== Rates Interface ==== |
- | === | + | ==== Agent Interface ==== |
- | === | + | ==== EDI ==== |
- | = | + | ==== Inventory Management ==== |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | === Inventory Management === | + | |
=== Etc === | === Etc === | ||
- | + | ==== Development based on Requirements not Detailed Design ==== | |
- | == | + | |
- | + | ||
- | + | ||
- | = | + | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + |
Revision as of 16:22, 11 May 2010
This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.
We need to build smart Supply Chain for CT2! ))
Contents |
Metrics
ftl
ftl - full time load
Assumptions:
- 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one full time employee
The following metrics are suggested:
- 1 ftl (high/full load)
- if average numb of hours required per week is 30-40
- 3/4 ftl (med load)
- if average numb of hours required per week is 20-30
- 1/2 ftl (low load)
- if average numb of hours required per week is 10-20
- 1/4 ftl (very low load)
- if average numb of hours required per week is 0-10