CT2 Resources Demand Supply Allocation
From UG
(Difference between revisions)
Line 4: | Line 4: | ||
We need to build smart Supply Chain for CT2! )) | We need to build smart Supply Chain for CT2! )) | ||
+ | |||
+ | == ftd == | ||
+ | |||
+ | Assumptions: | ||
+ | * 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one '''full time developer (ftd)''' | ||
+ | |||
+ | The following metrics are suggested: | ||
+ | |||
+ | * 1 ftd (high/full load) | ||
+ | :: if average numb of hours required per week is 30-40 | ||
+ | |||
+ | * 3/4 ftd (med load) | ||
+ | :: if average numb of hours required per week is 20-30 | ||
+ | |||
+ | * 1/2 ftd (low load) | ||
+ | :: if average numb of hours required per week is 10-20 | ||
+ | |||
+ | * 1/4 ftd (very low load) | ||
+ | :: if average numb of hours required per week is 0-10 | ||
== 2010 Forecast == | == 2010 Forecast == |
Revision as of 01:47, 5 May 2010
This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.
We need to build smart Supply Chain for CT2! ))
ftd
Assumptions:
- 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one full time developer (ftd)
The following metrics are suggested:
- 1 ftd (high/full load)
- if average numb of hours required per week is 30-40
- 3/4 ftd (med load)
- if average numb of hours required per week is 20-30
- 1/2 ftd (low load)
- if average numb of hours required per week is 10-20
- 1/4 ftd (very low load)
- if average numb of hours required per week is 0-10