CT2 Resources Demand Supply Allocation

From UG

(Difference between revisions)
Jump to: navigation, search
Line 4: Line 4:
We need to build smart Supply Chain for CT2!  ))
We need to build smart Supply Chain for CT2!  ))
 +
 +
== ftd ==
 +
 +
Assumptions:
 +
* 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one '''full time developer (ftd)'''
 +
 +
The following metrics are suggested:
 +
 +
* 1 ftd (high/full load)
 +
:: if average numb of hours required per week is 30-40
 +
 +
* 3/4 ftd (med load)
 +
:: if average numb of hours required per week is 20-30
 +
 +
* 1/2 ftd (low load)
 +
:: if average numb of hours required per week is 10-20
 +
 +
* 1/4 ftd (very low load)
 +
:: if average numb of hours required per week is 0-10
== 2010 Forecast ==
== 2010 Forecast ==

Revision as of 01:47, 5 May 2010


This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.

We need to build smart Supply Chain for CT2! ))

ftd

Assumptions:

  • 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one full time developer (ftd)

The following metrics are suggested:

  • 1 ftd (high/full load)
if average numb of hours required per week is 30-40
  • 3/4 ftd (med load)
if average numb of hours required per week is 20-30
  • 1/2 ftd (low load)
if average numb of hours required per week is 10-20
  • 1/4 ftd (very low load)
if average numb of hours required per week is 0-10

2010 Forecast