Constraints on Estimated Dates

From UG

(Difference between revisions)
Jump to: navigation, search
(Specific sequence of validating dates)
(FCL shipments)
 
(10 intermediate revisions not shown)
Line 9: Line 9:
=== Scope of this wiki ===
=== Scope of this wiki ===
-
Add constraints and validations for estimated dates.  Not allowing updates out of specified chronological order and for them to work in conjunction with the actual date validations that are already in place.
+
Add constraints / date validations for estimated dates, not allowing updates to take place out of specified chronological order.
== SOW 1 ==
== SOW 1 ==
-
'''Mantis:''' [http://ct.jaguarfreight.com/mantis/view.php?id=3185 3185] (CT2 Misc) Add Estimated Date Validation
+
* '''Mantis:0003185:(CT2 Misc) Add Estimated Date Validation'''
Core requirements:
Core requirements:
-
* '''Task type:''' Tweak.
+
* System should validate the chronological order in the specific sequence for all '''estimated''' dates.
-
* '''Where:''' Estimated CT Dates.
+
-
* '''What:''' System should validate the chronological order in the specific sequence for all estimated dates.
+
** The system must allow each of the dates to be the same as the previous date or more.
** The system must allow each of the dates to be the same as the previous date or more.
** If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved.  
** If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved.  
Line 27: Line 25:
**: 1) If CT is a part of Group and date field what out of order is selected for "Group save".
**: 1) If CT is a part of Group and date field what out of order is selected for "Group save".
**: 2) If CT is a part of Master.
**: 2) If CT is a part of Master.
-
** NOTE: Validations of estimated dates are not subject to Actual Date validations.
+
 
 +
'''NOTE: Validations of estimated dates are not subject to Actual Date validations.'''
=== Specific sequence of validating estimated dates ===
=== Specific sequence of validating estimated dates ===
Line 40: Line 39:
* [http://ct.jaguarfreight.com/wiki/CT_bo#Port_Of_Discharge_Estimated_Date Port of discharge Estimated date].
* [http://ct.jaguarfreight.com/wiki/CT_bo#Port_Of_Discharge_Estimated_Date Port of discharge Estimated date].
* [http://ct.jaguarfreight.com/wiki/CT_bo#Destination_Terminal_Estimated_Date Destination terminal Estimated date]. ''Only required if radio button is set to yes indicating the destination terminal is different than the port of discharge.''
* [http://ct.jaguarfreight.com/wiki/CT_bo#Destination_Terminal_Estimated_Date Destination terminal Estimated date]. ''Only required if radio button is set to yes indicating the destination terminal is different than the port of discharge.''
-
* [http://ct.jaguarfreight.com/wiki/Container#Actual_Delivery_Date Estimated delivery date].
+
* [http://ct.jaguarfreight.com/wiki/Container#Actual_Delivery_Date Requested Delivery date].
==== LCL shipments ====
==== LCL shipments ====
Line 58: Line 57:
* [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Delivery_Date Estimated delivery date].
* [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Delivery_Date Estimated delivery date].
-
==== Trucking shipments ====
+
==== Domestic Trucking shipments ====
-
''NOTE: Validations of Trucking CT dates will be specified later in separate mantis.''
+
* [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Export_Pick_Up_Date Estimated export pickup date]. ''Only required to be filled in if an export trucker is filled in.''
 +
* [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Delivery_Date Estimated delivery date].
 +
 
 +
==== Ocean Trucking shipments ====
 +
* [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Export_Pick_Up_Date Estimated export pickup date]. ''Required to be filled in if an export trucker is filled in OR a container number.''
 +
* [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Delivery_Date Estimated delivery date].
 +
 
 +
==== Air Trucking shipments ====
 +
* [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Export_Pick_Up_Date Estimated export pickup date]. ''Only required to be filled in if an export trucker is filled in.''
 +
* [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Delivery_Date Estimated delivery date].

Current revision as of 21:29, 3 January 2012


Contents

[edit] Info

[edit] Parent Mantis

[edit] Scope of this wiki

Add constraints / date validations for estimated dates, not allowing updates to take place out of specified chronological order.

[edit] SOW 1

  • Mantis:0003185:(CT2 Misc) Add Estimated Date Validation

Core requirements:

  • System should validate the chronological order in the specific sequence for all estimated dates.
    • The system must allow each of the dates to be the same as the previous date or more.
    • If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved.
      • Generalized example of error message: <Next date> cannot be confirmed until <previous date> has been confirmed in <CT #XXXXXX>.
      • Specific example of error message: Estimated arrival date cannot be confirmed until Estimated departure date has been confirmed.
      • CT # should be indicated in the error message:
      1) If CT is a part of Group and date field what out of order is selected for "Group save".
      2) If CT is a part of Master.

NOTE: Validations of estimated dates are not subject to Actual Date validations.

[edit] Specific sequence of validating estimated dates

  • Specific sequence of validating dates is conditioned on the set of events in the shipment.
  • Each event corresponds to the date of shipment depending on the mode of transport:

[edit] FCL shipments

[edit] LCL shipments

[edit] Air shipments

[edit] Domestic Trucking shipments

[edit] Ocean Trucking shipments

[edit] Air Trucking shipments