Requirements for EDI to TMS

From UG

(Difference between revisions)
Jump to: navigation, search
(0002327: [EDI to TMS] (Preliminary) a) proof of concept for ... CT data in the form of XML b) settings in non jag user profile for TMS)
(About and See also)
 
(7 intermediate revisions not shown)
Line 2: Line 2:
== About and See also ==  
== About and See also ==  
-
This is a Analysis / Requirements wiki for EDI to TMS proj
+
This is a Analysis / Requirements wiki for EDI to TMS proj Mantis: [http://mantis.jaguarfreight.com/mantis/view.php?id=2183 2183]
=== Related ===
=== Related ===
Line 104: Line 104:
=== 0002327: [EDI to TMS] (Preliminary) a) proof of concept for ... CT data in the form of XML b) settings in non jag user profile for TMS ===
=== 0002327: [EDI to TMS] (Preliminary) a) proof of concept for ... CT data in the form of XML b) settings in non jag user profile for TMS ===
* This task was replaced by M 2418
* This task was replaced by M 2418
 +
 +
=== 0002418: [EDI to TMS] (Client App Admin) (TMS Tab) Add TMS tab with config options ===
 +
 +
=== 0002361: [EDI to TMS] Implement FTP-connection functionality ===
 +
 +
=== 002493[EDI to TMS] Hide TMS Status on CT record header description for MOT Air&Ocean; if possible pls hide for truck air & truck ocean ===
 +
 +
=== 0002451: [EDI to TMS] (Client App Admin) (TMS Tab) Changes to accomodate Connecting Production/Demo Environments ===

Current revision as of 20:17, 20 December 2010


Contents

[edit] About and See also

This is a Analysis / Requirements wiki for EDI to TMS proj Mantis: 2183

[edit] Related

See also: Data Dictionary for EDI to TMS

[edit] Glossary

IP - Integration Point

Tendering - Tendering is the process of offering a load to a carrier and efficiently managing their response.

NOTE: Descartes Transportation Manager enables you to communicate with your contracted carriers electronically or manually. You set the communication method for a carrier when you set up your carrier contracts.

See also: p 205 of TM+10.1.3+Users+Guide.pdf

[edit] Introduction

Core Business Need: Jaguar needs ability to optimize truck domestic shipments:

Above features are normally present in TMS software. In addition this kind of system can:

  • automate tariffs (Working with Contracts chapter)
  • communication with carriers

To achieve that it was decided:

  • buy and use existing TMS solution (phase 1)
  • gradually add these features to CT2 (phase 2)

To complete phase 1 we need to implement:

[edit] Vendor evaluation

Currently there are 2 systems we are considering:

  • from Descartes
  • from Lean Logistics

[edit] CT2 and TMS integration in a nutshell

In a nutshell:

  • (shipment record will be created in CT2 and approved)
  • IP1: Shipment Import New CT2 forwarded to TMS through EDI
  • (in TMS Jag oper will run optimizations and select carrier)
  • (TMS sens bids to carriers)
  • IP2: Load Plan, code 990 TMS sends updates to CT2 (Carrier confirmed, etc)
  • (start processing shipments)
  • IP3: Status Message, code 214 TMS periodically submits updates into TMS (example: actual pickup date, etc)


See Figure below:

[edit] Figure Integration Points as defined by Descartes

File:Descartes IPs.JPG

[edit] Examples

Below are some examples of EDI messages used in Transportation Manager.

  • Shipment Import
  • 204 – Load tender message from Transportation Manager to the carrier. A load tender is a request to pick up a shipment and move it to another location.
  • 990 – Load Plan - The carrier’s tender response back to Transportation Manager (either a yes for picking up the shipment or no for not picking up the shipment).
  • 214 – A Status message from the carrier to Transportation Manager (e.g., “Delivered”).
  • 210 – An invoice from the carrier to Transportation Manager. The invoice will have the cost details of moving the shipment.

[edit] Business Requirements

[edit] Integration points

See following wikis:

[edit] Data dictionary and mapping

see Data Dictionary for EDI to TMS

[edit] History

[edit] 0002346: [EDI to TMS] Shipper role features

[edit] 0002361: [EDI to TMS] Implement FTP-connection functionality

[edit] 0002327: [EDI to TMS] (Preliminary) a) proof of concept for ... CT data in the form of XML b) settings in non jag user profile for TMS

  • This task was replaced by M 2418

[edit] 0002418: [EDI to TMS] (Client App Admin) (TMS Tab) Add TMS tab with config options

[edit] 0002361: [EDI to TMS] Implement FTP-connection functionality

[edit] 002493[EDI to TMS] Hide TMS Status on CT record header description for MOT Air&Ocean; if possible pls hide for truck air & truck ocean

[edit] 0002451: [EDI to TMS] (Client App Admin) (TMS Tab) Changes to accomodate Connecting Production/Demo Environments

Personal tools