Zoning

From UG

(Difference between revisions)
Jump to: navigation, search
(Ideas for future versions)
(Ideas for future versions)
Line 14: Line 14:
* Zone size: Max radius or max path should be defined. If locations are too spread out they can not be considered in one zone
* Zone size: Max radius or max path should be defined. If locations are too spread out they can not be considered in one zone
* Zone members (locations) could be automatically added by system based on new CT entered and max radius defined
* Zone members (locations) could be automatically added by system based on new CT entered and max radius defined
 +
* Multi client: One Zone would contain locations for many Client Company - this would allow consolidation
== History ==
== History ==

Revision as of 23:10, 12 May 2010

Contents

Concept

Zone is a set of locations that are "not too far from each other" on the map.

Pick Up Zone is a set of Ct#Pick_Up locations that are "not too far from each other" on the map.

Version 1 limitations

  • One Zone would contain only locations for one Client Company.
  • They would be entered manually by operator

Ideas for future versions

  • Zone size: Max radius or max path should be defined. If locations are too spread out they can not be considered in one zone
  • Zone members (locations) could be automatically added by system based on new CT entered and max radius defined
  • Multi client: One Zone would contain locations for many Client Company - this would allow consolidation

History

Version 1 from Tira

see version 8818

Personal tools