CT2 Resources Demand Supply Allocation
From UG
(Difference between revisions)
(→2010 Forecast) |
|||
Line 5: | Line 5: | ||
We need to build smart Supply Chain for CT2! )) | We need to build smart Supply Chain for CT2! )) | ||
- | == | + | == Metrics == |
+ | |||
+ | === ftdev === | ||
Assumptions: | Assumptions: | ||
- | * 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one '''full time developer ( | + | * 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one '''full time developer (ftdev)''' |
The following metrics are suggested: | The following metrics are suggested: | ||
Line 23: | Line 25: | ||
* 1/4 ftd (very low load) | * 1/4 ftd (very low load) | ||
:: if average numb of hours required per week is 0-10 | :: if average numb of hours required per week is 0-10 | ||
+ | |||
+ | === BAs, SAs, QAs === | ||
+ | |||
+ | TBD | ||
== 2010 May Forecast == | == 2010 May Forecast == |
Revision as of 01:57, 5 May 2010
This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.
We need to build smart Supply Chain for CT2! ))
Contents |
Metrics
ftdev
Assumptions:
- 8 m/h a day ~ 40 m/h a week ~ 168 m/h a month ~ one full time developer (ftdev)
The following metrics are suggested:
- 1 ftd (high/full load)
- if average numb of hours required per week is 30-40
- 3/4 ftd (med load)
- if average numb of hours required per week is 20-30
- 1/2 ftd (low load)
- if average numb of hours required per week is 10-20
- 1/4 ftd (very low load)
- if average numb of hours required per week is 0-10
BAs, SAs, QAs
TBD
2010 May Forecast
Error margin: TBD.