KPI Business Requirements & Software Requirements Specification

From UG

(Difference between revisions)
Jump to: navigation, search
(Phase I - Core KPI Framework / Address gaps in Cost-Based KPIs)
(Phase I - Core KPI Framework / Address gaps in Cost-Based KPIs)
Line 53: Line 53:
==== Phase I - Core KPI Framework / Address gaps in Cost-Based KPIs ====
==== Phase I - Core KPI Framework / Address gaps in Cost-Based KPIs ====
-
<table border="5">
+
<table border="2">
<tr>
<tr>
<th>Phase</th>
<th>Phase</th>
 +
<th>Subphase</th>
<th>Start</th>
<th>Start</th>
<th>Complete</th>
<th>Complete</th>
Line 62: Line 63:
<tr>
<tr>
 +
<td rowspan="5"> Phase I - Core KPI Framework / Address gaps in Cost-Based KPIs</td>
<td>Requirements</td>
<td>Requirements</td>
<td>04/02/2012</td>
<td>04/02/2012</td>

Revision as of 01:10, 10 April 2012


Contents

Mantis

<Mantis Number(s) & Link>

Project Overview

Business Objective(s)

Key Performance Indicators (KPIs) are valuable metrics that clients and Jaguar Freight Services (JFS) can utilize to improve their supply chain management operations. These metrics report on cost performance, cycle time performance, load utilization performance, etc.. Examples include cost per pound, cycle time between shipment creation to approval, etc.. There are an infinite number of possibilities for what one might consider a KPI. It is up to the client and/or JFS management team to utilize these KPIs to identify weak areas of their operations and to develop strategic corrective action plans to improve logistics performance.

The objective of the CyberTrax2 KPI project is to provide an easy to use, intuitive, interactive interface for both internal JFS management and external client users to view and report on KPIs. It is absolutely imperative that the accuracy and mechanics of KPIs are well understood by all.

High Level Project Deliverables

  • KPI Dashboards
  • Multi-Level Interactive KPI Charts & Graphs
  • KPI Entitlements Management

Project Stakeholders & Roles

  • Simon Kaye - CEO - Project Sponsor
  • Marc Selter - VP - Product Manager
  • Alex Dobrovolsky - Director of Technology - Solutions Architect
  • Montira Renfrew - CT2 Systems Analyst
  • Mihail Tymoshenko - CT2 Software Developer (Elcosol)
  • Denise Guastella - CT2 Support Manager
  • Kostiantyn Ushakov - CEO/CTO Elcosol
  • Perry Lee - CT2 Project Manager

Project Scope

The below items are in-scope for this KPI project:

  • Design and implement a scalable KPI module that will satisfy all future KPI requirements for at least the next 3 years.
    • Design must take into consideration future KPIs requirements (Mobile, International, External Interfaces [Google Maps], etc..)
    • Fill in existing gaps (functional & non-functional) in existing cost-based KPI module.
    • Design and Implement a KPI module for both Internal CT2 and Client CT2 applications.
    • Implement below KPIs
      • Cost-Based KPIs (gaps only)
      • Date-based KPIs
      • Utilization/Optimization-based KPIs
      • International KPIs
        • Ocean (FCL & LCL)
        • Air
    • Ability to overlap & report on multiple KPIs.
  • Design and implement an entitlements management module to administer KPI-based entitlements. This specific KPI entitlements management module will need to fall in line with I-Portal entitlements management framework.

The below items are out-of-scope for this KPI project:

  • Address performance issues with any CT2 module outside of KPI.
  • Merge Internal CT2 and Client CT2 applications.
  • Mobile KPI

Project Dependencies

  • I-Portal Entitlements Management Framework must be designed prior to designing KPI Entitlement Management module.

High-Level Timelines

This project will be delivered in phases.

Phase I - Core KPI Framework / Address gaps in Cost-Based KPIs

Phase Subphase Start Complete
Phase I - Core KPI Framework / Address gaps in Cost-Based KPIs Requirements 04/02/2012 04/20/2012
Design 04/23/2012 05/18/2012
Construction 05/21/2012 06/15/2012
Verification 06/18/2012 07/20/2012
Maintenance 07/23/2012 08/03/2012

Phase II - Date-Based KPIs

Requirements

Design

Construction

Verification

Maintenance

Phase III - Utilization/Optimization KPIs

Requirements

Design

Construction

Verification

Maintenance

Phase IV - International

Requirements

Design

Construction

Verification

Maintenance

Risks

<Identify internal and external risks to the project: schedule, resources, technical, business, cost, market conditions, external vendors/partners, etc..>

Assumptions / Constraints

Assumptions

  • The KPI module will not require significant redeisgn within the next 3 years.
  • Critical resources (0.5 FTE Analyst and 1 FTE Developer) will be fully allocated to this proejct for its entire duration.
  • All major requirements would have been identified during the requirements/design phase of this project. Any requirements identified post design-phase will have minimal impact on project schedule and scope.
  • Project Team will document & provide walkthrough of entire KPI design prior to construction. All project documents will be signed off prior to construction.
  • QA resource will be fully allocated to this project during verfiication phase(s).
  • Business unit will have adequate resources to perform UAT during verification phase(s).
  • Current CT2 Chart & Graph library (JFreeChart) is sufficient to satisfy existing & future KPI requirements.
  • CT2 will be able to satisfy all KPI requirements with existing development framework & libraries (ZK framework).
  • All non-working periods (personal vacations, holidays, etc..) will be baked into project plan.
  • All resources will have acquire adequate knowledge of business & technology to fulfil their roles & responsibilities with minimal training.

Constraints

  • KPI module must not negatively impact the current performance of CyberTrax2.
  • KPI module must function under existing production server hardware.
  • All in-scope KPIs must be delivered and fully functional by end of year 2012.
  • Entire KPI project must be delivered with existing resources.

Business Requirements

<List each business requirement under a separate heading. Also include process flows (UML, Sequence Diagrams, Swimlane, Flow chart, etc..) as applicable>

BR1 [Core KPI Framework]

BR2 [Cost-based KPIs]

BR3 [Date-based KPIs]

BR4 [Utilization / Optimization KPIs]

BR5 [International KPIs]

BR6 [Overlapping KPIs]

Business Process Flow 1...

Business Process Flow 2...

Business Process Flow 3...

Functional/Non-Functional Requirements

<Identify all functional and non-functional requirements. Maintain standard headings. If a specific requirement is not required, note as Not Applicable. Each functional requirement must trace back to a specific business requirement.>

CyberTrax2 Internal Application

<Identify all functional requirements for CT2 Internal Application>

User Interface Requirements

Reporting Requirements

User Access / Security Requirements

Logging Requirements

Group / Master Requirements

Filtering Requirements

Archiving Requirements

CyberTrax2 Client Application

<Identify all functional requirements for CT2 Client Application>

User Interface Requirements

Reporting Requirements

User Access / Security Requirements

Logging Requirements

Group / Master Requirements

Filtering Requirements

Archiving Requirements

Non-Functional Requirements

<Identify all non-functional requirements for both CT2 Client Application and CT2 Internal Application>

Performance Requirements

Capacity Requirements

Support / Maintenance Requirements

User Guides
Training
Log(s) Accessibility

Testing Requirements

Security Requirements

Technical Design & Solution

Mock ups

<Include mock-ups of UI changes, report changes, etc..>

Technology Stack & Architecture

<Include changes to existing Technology Stack & Architecture - new libraries, updated library versions, new software/hardware, new interfaces, etc..>

Technical Diagrams (Flow Chart, Sequence, UML, Systems Architecture, Technical Architecture, Data Architecture, etc..)

<Include architecture diagrams and flow charts>

Web / Application (New/Modified classes, methods, etc..)

<List new or modified classes and methods>

Database (DDL changes - new/modified tables, indexes, stored procedures, etc..)

<Summarize database changes>

Configuration (Config File changes)

<Summarize config changes>

Logging (Log File changes)

<Summarize Log File changes and locations>

External Interfaces (EDI Message(s), external vendors)

<Identify any new external interfaces. Include sample request and reply along with field definitions. Include Source/Target server(s)/webservice(s) and functional accounts. If this is a modification of an existing EDI message, include samples of current message(s) and new message(s)>

Personal tools