CT2 Contingency Plan

From UG

(Difference between revisions)
Jump to: navigation, search
Line 3: Line 3:
===Summary===
===Summary===
-
The objective of CT2 Contigency Plan is to be able to recover and support continuity of business resulting from a full data center outage in our Production hosted environment. Currently '''CT2, SugarCRM, Mantis, Wiki, Homepage websites''' are host..
+
The objective of CT2 Contigency Plan is to be able to recover and support continuity of business of all critical systems hosted by Rackspace resulting from a full datacenter outage. Currently '''CT2, SugarCRM, Mantis, Wiki, Homepage websites''' are hosted by Rackspace in Texas. This wiki should document all steps necessary to failover to a Disaster Recovery site (current designated as Valley Stream, NY office). This includes steps to restore databases, bring up web servers, application servers, FTP servers, and SMTP functionality. Normalization steps (reverting system from the Disaster Recovery back to Production site) will need to be documented as well.
 +
 
 +
External interfaces including, but not limited to EDI transfers to Trendset, EDI transfers to Descartes (TMS), and all other systems that interface with CyberTrax2 are in scope for this contingency plan.
 +
 
 +
At this point, there is no specific Recovery Point Objective (RPO) or Recovery Time Objective (RTO) for this plan. These parameters will be determined at a later time.  
 +
 
===Deployment Diagram===
===Deployment Diagram===
 +
[Perry will create in Visio]
===Recovery Steps===
===Recovery Steps===
 +
[Vlad to complete]
 +
Estimated recovery time [to be filled in]
 +
 +
'''Database
 +
Web Server
 +
Application Server
 +
FTP server
 +
SMTP server'''
 +
 +
Recovery steps......
===Normalization Steps===
===Normalization Steps===
 +
[Vlad to complete]
 +
Estimated normalization time [to be filled in]
 +
 +
'''Database
 +
Web Server
 +
Application Server
 +
FTP server
 +
SMTP server'''
 +
 +
Normalization steps...

Revision as of 19:57, 10 February 2012


Contents

Summary

The objective of CT2 Contigency Plan is to be able to recover and support continuity of business of all critical systems hosted by Rackspace resulting from a full datacenter outage. Currently CT2, SugarCRM, Mantis, Wiki, Homepage websites are hosted by Rackspace in Texas. This wiki should document all steps necessary to failover to a Disaster Recovery site (current designated as Valley Stream, NY office). This includes steps to restore databases, bring up web servers, application servers, FTP servers, and SMTP functionality. Normalization steps (reverting system from the Disaster Recovery back to Production site) will need to be documented as well.

External interfaces including, but not limited to EDI transfers to Trendset, EDI transfers to Descartes (TMS), and all other systems that interface with CyberTrax2 are in scope for this contingency plan.

At this point, there is no specific Recovery Point Objective (RPO) or Recovery Time Objective (RTO) for this plan. These parameters will be determined at a later time.


Deployment Diagram

[Perry will create in Visio]

Recovery Steps

[Vlad to complete] Estimated recovery time [to be filled in]

Database Web Server Application Server FTP server SMTP server

Recovery steps......

Normalization Steps

[Vlad to complete] Estimated normalization time [to be filled in]

Database Web Server Application Server FTP server SMTP server

Normalization steps...

Personal tools