Constraints on Estimated Dates
From UG
(Difference between revisions)
(→FCL shipments) |
(→Specific sequence of validating dates) |
||
Line 30: | Line 30: | ||
=== Specific sequence of validating dates === | === Specific sequence of validating dates === | ||
- | * Specific sequence of validating dates is conditioned on the set of events the shipment. | + | * Specific sequence of validating dates is conditioned on the set of events for the shipment. |
* Each event corresponds to the date of shipment depending on the mode of transport: | * Each event corresponds to the date of shipment depending on the mode of transport: | ||
Line 53: | Line 53: | ||
==== Air shipments ==== | ==== Air shipments ==== | ||
- | * [http://ct.jaguarfreight.com/wiki/CT_bo# | + | * [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Export_Pick_Up_Date Estimated export pickup date]. ''Only required to be filled in if an export trucker is filled in.'' |
- | + | * [http://ct.jaguarfreight.com/wiki/CT_bo#Airport_Of_Departure_Estimated_Date Airport of departure estimated time of departure]. | |
- | * [http://ct.jaguarfreight.com/wiki/CT_bo# | + | * [http://ct.jaguarfreight.com/wiki/CT_bo#Trans_Shipment_Estimated_Date Trans-shipment airport estimated time of departure]. ''Only required if check box is checked indicating this record has a trans-shipment point.'' |
- | * [http://ct.jaguarfreight.com/wiki/CT_bo# | + | * [http://ct.jaguarfreight.com/wiki/CT_bo#Airport_Of_Destination_Estimated_Date Airport of destination estimated time of arrival]. |
- | * [http://ct.jaguarfreight.com/wiki/CT_bo# | + | * [http://ct.jaguarfreight.com/wiki/CT_bo#Estimated_Delivery_Date Actual delivery date]. |
- | * [http://ct.jaguarfreight.com/wiki/CT_bo# | + | |
==== Trucking shipments ==== | ==== Trucking shipments ==== | ||
''NOTE: Validations of Trucking CT dates will be specified later in separate mantis.'' | ''NOTE: Validations of Trucking CT dates will be specified later in separate mantis.'' |
Revision as of 20:37, 23 November 2011
Contents |
Info
Parent Mantis
- mantis 0100
Scope of this wiki
Add constraints and validations for estimated dates. Not allowing updates out of specified chronological order and for them to work in conjunction with the actual date validations that are already in place.
SOW 1
Mantis: 3185 (CT2 Misc) Add Estimated Date Validation
Core requirements:
- Task type: Tweak.
- Where: Estimated CT Dates.
- What: System should validate the chronological order in the specific sequence for all estimated dates.
- The system must allow each of the dates to be the same as the previous date or more.
- If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved.
- Generalized example of error message: <Next date> cannot be confirmed until <previous date> has been confirmed in <CT #XXXXXX>.
- Specific example of error message: Estimated arrival date cannot be confirmed until Estimated departure date has been confirmed.
- CT # should be indicated in the error message:
- 1) If CT is a part of Group and date field what out of order is selected for "Group save".
- 2) If CT is a part of Master.
- NOTE: Validations of estimated dates are not subject to Actual Date validations.
Specific sequence of validating dates
- Specific sequence of validating dates is conditioned on the set of events for the shipment.
- Each event corresponds to the date of shipment depending on the mode of transport:
FCL shipments
- estimated collection date. Only required to be filled in if an export trucker is filled in.
- Origin terminal estimated date. Only required if radio button is set to yes indicating the origin terminal is different from the port of loading.
- Port of loading estimated date.
- Port of trans-ship estimated date. Only required if check box is checked indicating this record has a trans-shipment point.
- Port of discharge estimated date.
- Destination terminal estimated date. Only required if radio button is set to yes indicating the destination terminal is different than the port of discharge.
- Estimated delivery date.
LCL shipments
- Notification date.
- Actual export pickup date. Only if the estimated export pickup date is entered.
- Origin terminal actual date. Only if radio button is set to yes indicating it would differ from Port of Loading actual date.
- Port of loading actual date.
- Port of trans-ship actual date. Only if check box is checked indicating this record has a trans-shipment point.
- Port of discharge actual date.
- Destination terminal actual date. Only if radio button is set to yes indicating the destination terminal is different than the port of discharge.
- Actual delivery date or delivery comment.
Air shipments
- Estimated export pickup date. Only required to be filled in if an export trucker is filled in.
- Airport of departure estimated time of departure.
- Trans-shipment airport estimated time of departure. Only required if check box is checked indicating this record has a trans-shipment point.
- Airport of destination estimated time of arrival.
- Actual delivery date.
Trucking shipments
NOTE: Validations of Trucking CT dates will be specified later in separate mantis.