DRs and KPIs project (MAIN WIKI)

From UG

(Difference between revisions)
Jump to: navigation, search
(Implem plan)
 
(5 intermediate revisions not shown)
Line 2: Line 2:
== Info ==
== Info ==
 +
 +
== Concepts and Glossary ==
 +
 +
At this moment we see 2 families of DR/KPI reports:
 +
* Action Required
 +
* All others (cost per unit, etc)
 +
 +
They differ in visual representation as well in how they are administered.
 +
 +
There is another classification by access (internal vs external).
== Wikis ==
== Wikis ==
== Implem plan ==
== Implem plan ==
 +
 +
'''Tasks:'''
* 1/ Develop professional look and feel for DRs interface, particularly interactive plots, bar charts, etc - 3131
* 1/ Develop professional look and feel for DRs interface, particularly interactive plots, bar charts, etc - 3131
* 2/ Create first professionally looking and fully functional "external" KPI (Cost per pound/TMS version) - 3131
* 2/ Create first professionally looking and fully functional "external" KPI (Cost per pound/TMS version) - 3131
-
* 3/ Create first fully functional "internal" KPI (Past Due)
+
* 3/
-
* 4/ Add Dashboard config
+
** a/ Create first fully functional "internal" KPI (Past Due) - 2412
 +
** b/ Add specific "internal" DRs/KPIs (8 more Action Required reps) - 3068
 +
* 4/ Add Dashboard config -
 +
** ''0003067: [* DR/KPI] (Dashboard) Create Dashboard framework ''
 +
 
* 5/ Add DR/KPI config
* 5/ Add DR/KPI config
 +
* 9/ Add options to "Reports/DRs Scheduler"
 +
* 6/ Introduce Jag user profile (note: this is also under IPortal proj)
* 6/ Introduce Jag user profile (note: this is also under IPortal proj)
* 7/ Create common user profile (all roles) (note: this is also under IPortal proj)
* 7/ Create common user profile (all roles) (note: this is also under IPortal proj)
* 8/ Add config to make sure DR/KPIs comply with SaaS requirement (link to user/company visibility, link to proper EDI)
* 8/ Add config to make sure DR/KPIs comply with SaaS requirement (link to user/company visibility, link to proper EDI)
-
* 9/ Add options to "Reports/DRs Scheduler"
+
 
* 10/ Improve users management panel (filters, apply action to many users at the same time)
* 10/ Improve users management panel (filters, apply action to many users at the same time)
* 11/ Advance user groups concept (define operations groups, link to office and teamleads, etc)
* 11/ Advance user groups concept (define operations groups, link to office and teamleads, etc)
* 12/ Clarify requirement for 2nd level for internal KPIs
* 12/ Clarify requirement for 2nd level for internal KPIs
-
* 13/ Add specific "internal" DRs/KPIs (8 more Action Required reps)
+
* 13/ see 3b
* 14/ Add specific "external" DRs/KPIs (generic Cost KPIs, Times KPIs, Average loads KPIs, Total cost KPIs, etc)
* 14/ Add specific "external" DRs/KPIs (generic Cost KPIs, Times KPIs, Average loads KPIs, Total cost KPIs, etc)
* 15/ Misc (add more filters to some reports, etc)
* 15/ Misc (add more filters to some reports, etc)
-
Related mantis:
+
'''Related mantis:'''
-
* 3131 [DR/KPI] (Cost per pound/TMS version) Significantly improve Look and feel. Fix bugs. Add missing functionality. Part B. // Spr#8d
+
* 0003131: [* DR/KPI] (Cost per pound/TMS version) Significantly improve Look and feel. Fix bugs. Add missing functionality. Part B. // Spr#8d
-
*
+
* 0003062: [* DR/KPI] Add remaining 9 existing internal reps to Dashboard
 +
* 0003067: [* DR/KPI] (Dashboard) Create Dashboard framework
 +
* 0003076: [* DR/KPI] Cost (per unit) KPIs
 +
* 0002978: [* DR/KPI] (External KPIs) Average Time KPI (Level 1, 2, 3)

Current revision as of 16:39, 29 September 2011


Contents

[edit] Info

[edit] Concepts and Glossary

At this moment we see 2 families of DR/KPI reports:

  • Action Required
  • All others (cost per unit, etc)

They differ in visual representation as well in how they are administered.

There is another classification by access (internal vs external).

[edit] Wikis

[edit] Implem plan

Tasks:

  • 1/ Develop professional look and feel for DRs interface, particularly interactive plots, bar charts, etc - 3131
  • 2/ Create first professionally looking and fully functional "external" KPI (Cost per pound/TMS version) - 3131
  • 3/
    • a/ Create first fully functional "internal" KPI (Past Due) - 2412
    • b/ Add specific "internal" DRs/KPIs (8 more Action Required reps) - 3068
  • 4/ Add Dashboard config -
    • 0003067: [* DR/KPI] (Dashboard) Create Dashboard framework
  • 5/ Add DR/KPI config
  • 9/ Add options to "Reports/DRs Scheduler"
  • 6/ Introduce Jag user profile (note: this is also under IPortal proj)
  • 7/ Create common user profile (all roles) (note: this is also under IPortal proj)
  • 8/ Add config to make sure DR/KPIs comply with SaaS requirement (link to user/company visibility, link to proper EDI)
  • 10/ Improve users management panel (filters, apply action to many users at the same time)
  • 11/ Advance user groups concept (define operations groups, link to office and teamleads, etc)
  • 12/ Clarify requirement for 2nd level for internal KPIs
  • 13/ see 3b
  • 14/ Add specific "external" DRs/KPIs (generic Cost KPIs, Times KPIs, Average loads KPIs, Total cost KPIs, etc)
  • 15/ Misc (add more filters to some reports, etc)

Related mantis:

  • 0003131: [* DR/KPI] (Cost per pound/TMS version) Significantly improve Look and feel. Fix bugs. Add missing functionality. Part B. // Spr#8d
  • 0003062: [* DR/KPI] Add remaining 9 existing internal reps to Dashboard
  • 0003067: [* DR/KPI] (Dashboard) Create Dashboard framework
  • 0003076: [* DR/KPI] Cost (per unit) KPIs
  • 0002978: [* DR/KPI] (External KPIs) Average Time KPI (Level 1, 2, 3)
Personal tools