DRs and KPIs project (MAIN WIKI)
From UG
(Difference between revisions)
(→Implem plan) |
(→Implem plan) |
||
Line 7: | Line 7: | ||
== Implem plan == | == Implem plan == | ||
- | * Add Dashboard config | + | * 1/ Develop professional look and feel for DRs interface, particularly interactive plots, bar charts, etc - 3131 |
- | * Add DR/KPI config | + | * 2/ Create first professionally looking and fully functional "external" KPI (Cost per pound/TMS version) - 3131 |
- | * Introduce Jag user profile (note: this is also under IPortal proj) | + | * 3/ Create first fully functional "internal" KPI (Past Due) |
- | * Create common user profile (all roles) (note: this is also under IPortal proj) | + | * 4/ Add Dashboard config |
- | * Add config to make sure DR/KPIs comply with SaaS requirement (link to user/company visibility, link to proper EDI) | + | * 5/ Add DR/KPI config |
- | * Add options to "Reports/DRs Scheduler" | + | * 6/ Introduce Jag user profile (note: this is also under IPortal proj) |
- | * Improve users management panel (filters, apply action to many users at the same time) | + | * 7/ Create common user profile (all roles) (note: this is also under IPortal proj) |
- | * Advance user groups concept (define operations groups, link to office and teamleads, etc) | + | * 8/ Add config to make sure DR/KPIs comply with SaaS requirement (link to user/company visibility, link to proper EDI) |
- | * Clarify requirement for 2nd level for internal KPIs | + | * 9/ Add options to "Reports/DRs Scheduler" |
- | * Add specific "internal" DRs/KPIs (8 more Action Required reps) | + | * 10/ Improve users management panel (filters, apply action to many users at the same time) |
- | * Add specific "external" DRs/KPIs (generic Cost KPIs, Times KPIs, Average loads KPIs, Total cost KPIs, etc) | + | * 11/ Advance user groups concept (define operations groups, link to office and teamleads, etc) |
- | * Misc (add more filters to some reports, etc) | + | * 12/ Clarify requirement for 2nd level for internal KPIs |
+ | * 13/ Add specific "internal" DRs/KPIs (8 more Action Required reps) | ||
+ | * 14/ Add specific "external" DRs/KPIs (generic Cost KPIs, Times KPIs, Average loads KPIs, Total cost KPIs, etc) | ||
+ | * 15/ Misc (add more filters to some reports, etc) | ||
+ | |||
+ | Related mantis: | ||
+ | |||
+ | * 3131 [DR/KPI] (Cost per pound/TMS version) Significantly improve Look and feel. Fix bugs. Add missing functionality. Part B. // Spr#8d | ||
+ | * |
Revision as of 09:43, 31 August 2011
Info
Wikis
Implem plan
- 1/ Develop professional look and feel for DRs interface, particularly interactive plots, bar charts, etc - 3131
- 2/ Create first professionally looking and fully functional "external" KPI (Cost per pound/TMS version) - 3131
- 3/ Create first fully functional "internal" KPI (Past Due)
- 4/ Add Dashboard config
- 5/ Add DR/KPI config
- 6/ Introduce Jag user profile (note: this is also under IPortal proj)
- 7/ Create common user profile (all roles) (note: this is also under IPortal proj)
- 8/ Add config to make sure DR/KPIs comply with SaaS requirement (link to user/company visibility, link to proper EDI)
- 9/ Add options to "Reports/DRs Scheduler"
- 10/ Improve users management panel (filters, apply action to many users at the same time)
- 11/ Advance user groups concept (define operations groups, link to office and teamleads, etc)
- 12/ Clarify requirement for 2nd level for internal KPIs
- 13/ Add specific "internal" DRs/KPIs (8 more Action Required reps)
- 14/ Add specific "external" DRs/KPIs (generic Cost KPIs, Times KPIs, Average loads KPIs, Total cost KPIs, etc)
- 15/ Misc (add more filters to some reports, etc)
Related mantis:
- 3131 [DR/KPI] (Cost per pound/TMS version) Significantly improve Look and feel. Fix bugs. Add missing functionality. Part B. // Spr#8d