2011 July August
From UG
(→Dev Sprint) |
(→Overview of mantis) |
||
(63 intermediate revisions not shown) | |||
Line 8: | Line 8: | ||
* Working Days: 23 | * Working Days: 23 | ||
* Holidays: none | * Holidays: none | ||
- | |||
- | |||
* Dev: http://ct.jaguarfreight.com/mantis/view.php?id=2995 | * Dev: http://ct.jaguarfreight.com/mantis/view.php?id=2995 | ||
+ | * BA: http://ct.jaguarfreight.com/mantis/view.php?id=3068 | ||
- | + | * Sprint plan: [[Plan for July August Sprint]] | |
+ | * Rel Notes: [[Release Notes for 2011 July August Sprint]] | ||
- | + | == Daily Log == | |
- | + | ||
- | + | === PM & Estim week schedule and project reviews with Sprint manager === | |
- | + | ||
- | + | * Mon (Jul 4) - preliminary new Sprint plan is to be announced (Alex) | |
- | + | ||
- | + | * Tue - Smartphone App (Kostya) | |
- | + | ||
- | + | * Wed | |
- | + | ||
- | + | - Int Portal (Sasha); | |
- | | | + | |
- | | align="center" style="background:#f0f0f0;"|''' | + | - EDI with Trenset (Misha) |
- | | align="center" style="background:#f0f0f0;"|''' | + | |
+ | * Th - Rates DB (AK/Misha) | ||
+ | |||
+ | * Fri - Dash/DashReps framework&reports (AK) | ||
+ | |||
+ | * Mon & Tue (Jul 11, 12) | ||
+ | |||
+ | - follow up meetings for all key projects discussed last week | ||
+ | - review of Dev Methodology, mantis structure, fields, roles and responsibilities, etc | ||
+ | - New Sprint plan is to be confirmed | ||
+ | |||
+ | === DT WUp - Dev team weekly updates meeting === | ||
+ | |||
+ | *When: Thursdays, 7-9 am | ||
+ | *Who: all devs, QAs, Sup eng | ||
+ | *Why: | ||
+ | ** individual updates from developers/QA/support: | ||
+ | *** explain tasks assigned | ||
+ | *** what work has been completed over last week | ||
+ | *** on schedule? behind schedule? why? how to improve? how to learn from this? | ||
+ | *** suggestions from everyone | ||
+ | ** updates/conclusions from Lead PM | ||
+ | *** old/new biz proc review\ | ||
+ | *** systems review | ||
+ | *** updates from upper managers | ||
+ | |||
+ | === Org chart === | ||
+ | |||
+ | [[File:Orgchart2011april13.jpg]] | ||
+ | |||
+ | === Roles and relationships === | ||
+ | |||
+ | [[File:No SA process Apr 13.jpg]] | ||
+ | |||
+ | === New Mantis === | ||
+ | |||
+ | ==== Folders ==== | ||
+ | |||
+ | result | ||
+ | |||
+ | {| {{table}} border="1" | ||
+ | | align="center" style="background:#f0f0f0;"|'''Name''' | ||
+ | | align="center" style="background:#f0f0f0;"|'''Descr''' | ||
|- | |- | ||
- | | | + | | * Archived / Released ||All tasks that have been released, completed, discontinued, etc |
|- | |- | ||
- | | | + | | * CT2 map ||All CT2 components, subcomponents, etc (a.k.a. “parents”) |
|- | |- | ||
- | | | + | | * Watchlists / Files / Misc || |
|- | |- | ||
- | | | + | | 0. Support ||Support related tasks |
|- | |- | ||
- | | | + | | 1. Backlog ||Dev backlog (pre-BA and tasks on hold) |
|- | |- | ||
- | | | + | | 2. BA Sprint ||tasks in current BA sprint |
|- | |- | ||
- | | | + | | 3. Dev Est ||tasks passed BA phase and in Estimation phase by development |
|- | |- | ||
- | | | + | | 4. Dev Sprint ||tasks in current Dev sprint |
|- | |- | ||
- | | | + | | 5. WU Backlog ||Wiki update backlog (tasks released but not wiki updated) |
+ | |- | ||
+ | | | ||
|} | |} | ||
- | + | ==== Fields ==== | |
- | + | {| {{table}} border="1" | |
- | === | + | | align="center" style="background:#f0f0f0;"|'''Name''' |
- | + | | align="center" style="background:#f0f0f0;"|'''Meaning''' | |
- | {| {{table}} | + | | align="center" style="background:#f0f0f0;"|'''Type''' |
- | + | | align="center" style="background:#f0f0f0;"|'''Possible Values''' | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | | align="center" style="background:#f0f0f0;"|'''''' | + | |
- | | align="center" style="background:#f0f0f0;"|''' | + | |
- | | align="center" style="background:#f0f0f0;"|''' | + | |
- | | align="center" style="background:#f0f0f0;"|''' | + | |
|- | |- | ||
- | | | + | | %UAT ||to be discontinued?||Numeric || |
|- | |- | ||
- | | | + | | %WU ||to be discontinued?||Numeric || |
|- | |- | ||
- | | | + | | .amh ||total num of dev man hours spent||String || |
|- | |- | ||
- | | | + | | .emh ||estimated man hours||Float || |
+ | |- | ||
+ | | .emhR ||estimated man hours with Risk||Float || | ||
+ | |- | ||
+ | | .rmhR ||remaining man hours (with Risk)||Float || | ||
+ | |- | ||
+ | | b? ||bug?||Enumeration ||N|Y | ||
+ | |- | ||
+ | | comp ||CT2 component||Enumeration ||?|AccCore|AccMisc|AccReps|-|OpsCore|OpsMisc|OpsRep|OpsPdf|-|Misc/Sys|JagIT|-|Client|ClientReps| | ||
+ | |- | ||
+ | | p.BA ||Business Analyst||Enumeration ||?|Denise|Tracie|Alex|Tira | ||
+ | |- | ||
+ | | p.Dev ||Developer||Enumeration ||?|Kostya|Sasha|Koltsov|Mihail|Vlad|Andrei|Roma|Alex|Tira | ||
+ | |- | ||
+ | | p.MO ||Module Owner||Enumeration ||?|Simon|Marc|Karen|Alex|Chikei|All | ||
+ | |- | ||
+ | | p.SQA ||Systems and Quality Analyst||Enumeration ||?|AG|Roma | ||
+ | |- | ||
+ | | phase ||Dev phase||Enumeration ||?|Dev|QA|UAT|WU | ||
+ | |- | ||
+ | | QApf ||passed QA?||Enumeration ||?|pass|fail | ||
+ | |- | ||
+ | | Rel# ||Release number (discontinue?)||Enumeration || | ||
+ | |- | ||
+ | | Spec updated ||wiki spec updated after implementation?||Enumeration ||No|Yes|N/A | ||
+ | |- | ||
+ | | Spr# ||Sprint number||Enumeration ||?|jan7-feb3|April|JA.dev|JA.ba|AS.dev|AS.ba | ||
+ | |- | ||
+ | | T ||Priority||Enumeration || ?|p0|p1|p2|p3|p4|p5|p6|p7|p8|p9 | ||
+ | |- | ||
+ | | | ||
|} | |} | ||
+ | === Aug 4 === | ||
+ | |||
+ | Todos Roma: | ||
+ | * For Pdfs: | ||
+ | ** move all wikis from "Ops Pdfs Coommon" to "OpsPdfsMisc"; kill Common | ||
+ | ** move 1997 1686 1698 1755 1680 1666 into 664 | ||
+ | |||
+ | For OpsReps: | ||
+ | * move 1585 2036 into 1600 | ||
+ | |||
+ | Todos AG: | ||
+ | * create mantis and wiki struct for OpsCore, OpsMisc, Client and call(present) BA/SQA team for review | ||
+ | |||
+ | Todos Alex: | ||
+ | * create mantis and wiki struct for JagIT, MiscSys and call(present) BA/SQA team for review | ||
+ | |||
+ | === Aug 5 Fri === | ||
+ | |||
+ | Roma todos: | ||
+ | * when have time review all bugs in DevEst (count: 30). Suggest a list for next Spr. | ||
+ | |||
+ | === Aug 6 === | ||
+ | |||
+ | '''Clients E0:''' | ||
+ | |||
+ | Cosmetech Mably Europe | ||
+ | Cosmetech Mably Int'l | ||
+ | Cosmetech Mably Int'l (HK) Ltd | ||
+ | |||
+ | Coty Australia | ||
+ | Coty Espana | ||
+ | COTY EUROPE | ||
+ | Coty Geneva S.A Div. CP Trex | ||
+ | COTY GERMANY | ||
+ | COTY ITALY | ||
+ | Coty Prestige Japan K.K. | ||
+ | Coty Prestige Southeast Asia (HK) Ltd | ||
+ | Coty Prestige Southeast Asia Pte. Ltd. | ||
+ | Coty Sanford | ||
+ | Coty Sanford Vendors | ||
+ | Coty Services and Logistics | ||
+ | Coty Shanghai | ||
+ | COTY SPAIN | ||
+ | Coty UK | ||
+ | |||
+ | |||
+ | '''Bill To:''' | ||
+ | |||
+ | COSMETECH MABLY EUROPE - GENNEVILLIERS | ||
+ | COSMETECH MABLY INTL (HK) LTD - CENTRAL | ||
+ | |||
+ | Coty US LLC - Sanford | ||
+ | COTY SERVICES AND LOGISTICS GMBH - MAINZ | ||
+ | COTY PRESTIGE SOUTHEAST ASIA (HK) LTD - Wanchai | ||
+ | COTY PRESTIGE SHANGHAI (HK) LTD - NT | ||
+ | COTY MANUFACTURING UK LTD - ASHFORD | ||
+ | |||
+ | '''Users:''' | ||
+ | |||
+ | 10 users, all have email like @cotyinc.com | ||
+ | |||
+ | === Aug 15 === | ||
+ | |||
+ | Columns for "View Issues" page in "3. Dev Sprint" folder: | ||
+ | |||
+ | Status | ||
+ | ph | ||
+ | s# | ||
+ | T | ||
+ | m | ||
+ | MO | ||
+ | BA | ||
+ | QA | ||
+ | Dv | ||
+ | .e | ||
+ | .eR | ||
+ | .rR | ||
+ | 1 | ||
+ | 2 | ||
+ | 3 | ||
+ | 4 | ||
+ | b | ||
+ | <checkbox> | ||
+ | <edit pen> | ||
+ | ID | ||
+ | comp | ||
+ | Summary | ||
+ | |||
+ | === Aug 16 === | ||
+ | |||
+ | ==== BA Sprint Manager and Solutions Architect role ==== | ||
+ | ''Currently in this role: Alex'' | ||
+ | |||
+ | '''BA Sprint Manager role:''' | ||
+ | |||
+ | * Responsible for overall success of the BA Sprint and architecture of the system from business standpoint | ||
+ | |||
+ | * plans and monitors BA Sprint (during this sprint Biz Requirements are developed) | ||
+ | |||
+ | * plan is to be submitted to Board for approval | ||
+ | |||
+ | * Ideally all tasks planned for this Sprint should be delivered on time | ||
+ | |||
+ | '''Solutions Architect role:''' | ||
+ | |||
+ | * Responsible for overall architecture of the system from business standpoint (and in some sense from technical point as well) | ||
+ | |||
+ | * review of all changes | ||
+ | |||
+ | * detailed review of changes that affects core of the system | ||
+ | |||
+ | * develop/document solution for above-mentioned changes | ||
+ | |||
+ | * manage BA backlog (together with BAs) | ||
+ | |||
+ | * make sure that all changes submitted are in sync with Product Vision | ||
+ | |||
+ | * help MOs/BAs/Sales to develop product vision | ||
+ | |||
+ | * suggest new features as required | ||
+ | |||
+ | ==== Dev Sprint Manager and Support Manager role ==== | ||
+ | ''Currently in this role: Tira'' | ||
+ | |||
+ | '''Dev Sprint Management:''' | ||
+ | |||
+ | Responsible for overall success of the Dev Sprint. Ideally all tasks planned for the Sprint should be delivered on time. | ||
+ | |||
+ | * Before Sprint starts: | ||
+ | ** request wish list from BAs for next Spr | ||
+ | ** identify tasks that will roll over from current sprint | ||
+ | ** calculate emh per developer and make sure it is reasonable | ||
+ | ** if space permits add more tasks from "Dev Backlog" | ||
+ | ** send this list to BAs/MOs for review | ||
+ | ** schedule CT2 Board and confirm final version there | ||
+ | ** get together with BAs and map tasks into weeks (use 1,2,3,4 mantis fields to indicate num of week when task will be completed) | ||
+ | ** email this project plan to everyone | ||
+ | |||
+ | * During the Sprint: | ||
+ | ** once a week look at tasks scheduled to be completed that week (in mantis sort by week# and see if there any tasks tagged for this week and still in Dev). If there are ask developer/BA why, what is the new estimate. Escalate issue to Dev Manager as required. | ||
+ | ** (optional but useful) have weekly status update meeting with all developers/QAs/BAs | ||
+ | |||
+ | * At the end of the Sprint: | ||
+ | ** remind everyone that after release to staging all tasks must be in UAT passed state | ||
+ | ** compile and email brief release notes (detailed are to be compiled by BAs) | ||
+ | ** is some tasks with m=Y are delayed make decision to postpone release or carry over those tasks | ||
+ | ** email confirmed date of release | ||
+ | |||
+ | '''Support Management:''' | ||
+ | |||
+ | Responsible for overall success of the Support function. Also monitor: | ||
+ | |||
+ | * WU and TG phase (tasks should not accumulate there) | ||
+ | * Support folder (tasks should not accumulate there) | ||
+ | |||
+ | Ideally: | ||
+ | |||
+ | * all support requests are handled on timely manner | ||
+ | * all component wikis are updated regularly and quickly | ||
+ | * all users are trained in new features right after Release | ||
+ | |||
+ | Pls note that there are 2 levels of Support: | ||
+ | |||
+ | * BAs (level 1) | ||
+ | * QAs (level 2) | ||
+ | |||
+ | ==== Dev Manager and Technical Architect role ==== | ||
+ | ''Currently in this role: Kostya'' | ||
+ | |||
+ | * Responsible for overall success of the System from technical standpoint. | ||
+ | * Design best architecture and monitor | ||
+ | * Assign developers to components as required | ||
+ | * Apply best frameworks and practices | ||
+ | * review code and mentor developers | ||
+ | * be escalation point if developers are not performing | ||
+ | * share responsibility that system is designed accordingly to specs and with high quality. | ||
+ | * etc | ||
+ | |||
+ | ==== Overview of mantis ==== | ||
+ | |||
+ | All "active" tasks are distributed across the following folders: | ||
+ | |||
+ | * '''1. Support''' - all support tasks like help desk requests, training, etc | ||
+ | * '''2. BA Sprint''' - all tasks in ''current'' BA Sprint | ||
+ | * '''3. Dev Sprint''' - all tasks in ''current'' Dev sprint | ||
+ | |||
+ | Every task in '''BA Sprint''' travels through these phases (field "ph"): | ||
+ | |||
+ | * BA | ||
+ | * SA | ||
+ | * Est - tasks are reviewed/estimated by developers here and after that BA Spr Manager moves them to Dev Backlog | ||
+ | |||
+ | Every task in '''Dev Sprint''' travels through these phases: | ||
+ | |||
+ | * Dev | ||
+ | * QA | ||
+ | * UAT | ||
+ | * WU | ||
+ | * TG | ||
+ | |||
+ | Also there are 2 backlog folders: | ||
- | + | * '''BA Backlog''' - tasks that are suggested for future BA Sprints | |
- | * | + | * '''Dev Backlog''' - tasks that are passed BA/SA, estimated and waiting for future Dev Sprints |
- | + | Finally we have: | |
- | + | * '''Archived / Released''' released tasks that passed WU/TG and other closed tasks | |
+ | * '''CT2 map''' - all CT2 parents (sub-components) | ||
+ | * '''Watchlists / Files / Misc''' |
Current revision as of 19:45, 16 August 2011
Contents |
[edit] Sprint Info
- Start: May 30 Mon
- Staging: July 4 Mon
- Prod: July 7 Thu
- Working Days: 23
- Holidays: none
- Dev: http://ct.jaguarfreight.com/mantis/view.php?id=2995
- BA: http://ct.jaguarfreight.com/mantis/view.php?id=3068
- Sprint plan: Plan for July August Sprint
- Rel Notes: Release Notes for 2011 July August Sprint
[edit] Daily Log
[edit] PM & Estim week schedule and project reviews with Sprint manager
- Mon (Jul 4) - preliminary new Sprint plan is to be announced (Alex)
- Tue - Smartphone App (Kostya)
- Wed
- Int Portal (Sasha);
- EDI with Trenset (Misha)
- Th - Rates DB (AK/Misha)
- Fri - Dash/DashReps framework&reports (AK)
- Mon & Tue (Jul 11, 12)
- follow up meetings for all key projects discussed last week - review of Dev Methodology, mantis structure, fields, roles and responsibilities, etc - New Sprint plan is to be confirmed
[edit] DT WUp - Dev team weekly updates meeting
- When: Thursdays, 7-9 am
- Who: all devs, QAs, Sup eng
- Why:
- individual updates from developers/QA/support:
- explain tasks assigned
- what work has been completed over last week
- on schedule? behind schedule? why? how to improve? how to learn from this?
- suggestions from everyone
- updates/conclusions from Lead PM
- old/new biz proc review\
- systems review
- updates from upper managers
- individual updates from developers/QA/support:
[edit] Org chart
[edit] Roles and relationships
[edit] New Mantis
[edit] Folders
result
Name | Descr |
* Archived / Released | All tasks that have been released, completed, discontinued, etc |
* CT2 map | All CT2 components, subcomponents, etc (a.k.a. “parents”) |
* Watchlists / Files / Misc | |
0. Support | Support related tasks |
1. Backlog | Dev backlog (pre-BA and tasks on hold) |
2. BA Sprint | tasks in current BA sprint |
3. Dev Est | tasks passed BA phase and in Estimation phase by development |
4. Dev Sprint | tasks in current Dev sprint |
5. WU Backlog | Wiki update backlog (tasks released but not wiki updated) |
[edit] Fields
Name | Meaning | Type | Possible Values |
%UAT | to be discontinued? | Numeric | |
%WU | to be discontinued? | Numeric | |
.amh | total num of dev man hours spent | String | |
.emh | estimated man hours | Float | |
.emhR | estimated man hours with Risk | Float | |
.rmhR | remaining man hours (with Risk) | Float | |
b? | bug? | Enumeration | Y |
comp | CT2 component | Enumeration | AccCore|AccMisc|AccReps|-|OpsCore|OpsMisc|OpsRep|OpsPdf|-|Misc/Sys|JagIT|-|Client|ClientReps| |
p.BA | Business Analyst | Enumeration | Denise|Tracie|Alex|Tira |
p.Dev | Developer | Enumeration | Kostya|Sasha|Koltsov|Mihail|Vlad|Andrei|Roma|Alex|Tira |
p.MO | Module Owner | Enumeration | Simon|Marc|Karen|Alex|Chikei|All |
p.SQA | Systems and Quality Analyst | Enumeration | AG|Roma |
phase | Dev phase | Enumeration | Dev|QA|UAT|WU |
QApf | passed QA? | Enumeration | pass|fail |
Rel# | Release number (discontinue?) | Enumeration | |
Spec updated | wiki spec updated after implementation? | Enumeration | Yes|N/A |
Spr# | Sprint number | Enumeration | jan7-feb3|April|JA.dev|JA.ba|AS.dev|AS.ba |
T | Priority | Enumeration | p0|p1|p2|p3|p4|p5|p6|p7|p8|p9 |
[edit] Aug 4
Todos Roma:
- For Pdfs:
- move all wikis from "Ops Pdfs Coommon" to "OpsPdfsMisc"; kill Common
- move 1997 1686 1698 1755 1680 1666 into 664
For OpsReps:
- move 1585 2036 into 1600
Todos AG:
- create mantis and wiki struct for OpsCore, OpsMisc, Client and call(present) BA/SQA team for review
Todos Alex:
- create mantis and wiki struct for JagIT, MiscSys and call(present) BA/SQA team for review
[edit] Aug 5 Fri
Roma todos:
- when have time review all bugs in DevEst (count: 30). Suggest a list for next Spr.
[edit] Aug 6
Clients E0:
Cosmetech Mably Europe Cosmetech Mably Int'l Cosmetech Mably Int'l (HK) Ltd
Coty Australia Coty Espana COTY EUROPE Coty Geneva S.A Div. CP Trex COTY GERMANY COTY ITALY Coty Prestige Japan K.K. Coty Prestige Southeast Asia (HK) Ltd Coty Prestige Southeast Asia Pte. Ltd. Coty Sanford Coty Sanford Vendors Coty Services and Logistics Coty Shanghai COTY SPAIN Coty UK
Bill To:
COSMETECH MABLY EUROPE - GENNEVILLIERS COSMETECH MABLY INTL (HK) LTD - CENTRAL
Coty US LLC - Sanford COTY SERVICES AND LOGISTICS GMBH - MAINZ COTY PRESTIGE SOUTHEAST ASIA (HK) LTD - Wanchai COTY PRESTIGE SHANGHAI (HK) LTD - NT COTY MANUFACTURING UK LTD - ASHFORD
Users:
10 users, all have email like @cotyinc.com
[edit] Aug 15
Columns for "View Issues" page in "3. Dev Sprint" folder:
Status ph s# T m MO BA QA Dv .e .eR .rR 1 2 3 4 b <checkbox> <edit pen> ID comp Summary
[edit] Aug 16
[edit] BA Sprint Manager and Solutions Architect role
Currently in this role: Alex
BA Sprint Manager role:
- Responsible for overall success of the BA Sprint and architecture of the system from business standpoint
- plans and monitors BA Sprint (during this sprint Biz Requirements are developed)
- plan is to be submitted to Board for approval
- Ideally all tasks planned for this Sprint should be delivered on time
Solutions Architect role:
- Responsible for overall architecture of the system from business standpoint (and in some sense from technical point as well)
- review of all changes
- detailed review of changes that affects core of the system
- develop/document solution for above-mentioned changes
- manage BA backlog (together with BAs)
- make sure that all changes submitted are in sync with Product Vision
- help MOs/BAs/Sales to develop product vision
- suggest new features as required
[edit] Dev Sprint Manager and Support Manager role
Currently in this role: Tira
Dev Sprint Management:
Responsible for overall success of the Dev Sprint. Ideally all tasks planned for the Sprint should be delivered on time.
- Before Sprint starts:
- request wish list from BAs for next Spr
- identify tasks that will roll over from current sprint
- calculate emh per developer and make sure it is reasonable
- if space permits add more tasks from "Dev Backlog"
- send this list to BAs/MOs for review
- schedule CT2 Board and confirm final version there
- get together with BAs and map tasks into weeks (use 1,2,3,4 mantis fields to indicate num of week when task will be completed)
- email this project plan to everyone
- During the Sprint:
- once a week look at tasks scheduled to be completed that week (in mantis sort by week# and see if there any tasks tagged for this week and still in Dev). If there are ask developer/BA why, what is the new estimate. Escalate issue to Dev Manager as required.
- (optional but useful) have weekly status update meeting with all developers/QAs/BAs
- At the end of the Sprint:
- remind everyone that after release to staging all tasks must be in UAT passed state
- compile and email brief release notes (detailed are to be compiled by BAs)
- is some tasks with m=Y are delayed make decision to postpone release or carry over those tasks
- email confirmed date of release
Support Management:
Responsible for overall success of the Support function. Also monitor:
- WU and TG phase (tasks should not accumulate there)
- Support folder (tasks should not accumulate there)
Ideally:
- all support requests are handled on timely manner
- all component wikis are updated regularly and quickly
- all users are trained in new features right after Release
Pls note that there are 2 levels of Support:
- BAs (level 1)
- QAs (level 2)
[edit] Dev Manager and Technical Architect role
Currently in this role: Kostya
- Responsible for overall success of the System from technical standpoint.
- Design best architecture and monitor
- Assign developers to components as required
- Apply best frameworks and practices
- review code and mentor developers
- be escalation point if developers are not performing
- share responsibility that system is designed accordingly to specs and with high quality.
- etc
[edit] Overview of mantis
All "active" tasks are distributed across the following folders:
- 1. Support - all support tasks like help desk requests, training, etc
- 2. BA Sprint - all tasks in current BA Sprint
- 3. Dev Sprint - all tasks in current Dev sprint
Every task in BA Sprint travels through these phases (field "ph"):
- BA
- SA
- Est - tasks are reviewed/estimated by developers here and after that BA Spr Manager moves them to Dev Backlog
Every task in Dev Sprint travels through these phases:
- Dev
- QA
- UAT
- WU
- TG
Also there are 2 backlog folders:
- BA Backlog - tasks that are suggested for future BA Sprints
- Dev Backlog - tasks that are passed BA/SA, estimated and waiting for future Dev Sprints
Finally we have:
- Archived / Released released tasks that passed WU/TG and other closed tasks
- CT2 map - all CT2 parents (sub-components)
- Watchlists / Files / Misc