2413 rfd
From UG
(Difference between revisions)
(created RFD) |
(→Details: renamed "Details" section to "Specific sequence of validating dates") |
||
(5 intermediate revisions not shown) | |||
Line 9: | Line 9: | ||
* '''Where:''' Actual CT Dates. | * '''Where:''' Actual CT Dates. | ||
* '''What:''' System should validate the chronological order in the specific sequence for all actual dates. | * '''What:''' System should validate the chronological order in the specific sequence for all actual dates. | ||
+ | ** The system must allow each of the dates to be the same as the previous date or more. | ||
+ | ** If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved. | ||
+ | *** ''Generalized example of error message:'' '''<Next date>''' cannot be confirmed until '''<previous date>''' has been confirmed in '''<CT #XXXXXX>'''. | ||
+ | *** ''Specific example of error message:'' '''Actual arrival date''' cannot be confirmed until '''actual departure date''' has been confirmed. | ||
+ | *** CT # should be indicated in the error message: | ||
+ | **: 1) If CT is a part of Group and date field what out of order is selected for "Group save". | ||
+ | **: 2) If CT is a part of Master. | ||
** NOTE: Validations of estimated dates are no longer required. | ** NOTE: Validations of estimated dates are no longer required. | ||
- | === | + | === Specific sequence of validating dates === |
+ | * Specific sequence of validating dates is conditioned on the set of events the shipment. | ||
+ | * Each event corresponds to the date of shipment depending on the mode of transport: | ||
+ | ==== FCL shipments ==== | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Notification_Date Notification date]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/Container#Actual_Export_Pick_Up_Date Actual collection date]. ''Only required to be filled in if an estimated collection date is filled in.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Origin_Terminal_Actual_Date Origin terminal actual date]. ''Only required if radio button is set to yes indicating the origin terminal is different from the port of loading.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Port_Of_Loading_Actual_Date Port of loading actual date]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Trans_Shipment_Actual_Date Port of trans-ship actual date]. ''Only if check box is checked indicating this record has a trans-shipment point.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Port_Of_Discharge_Actual_Date Port of discharge actual date]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Destination_Terminal_Actual_Date Destination terminal actual date]. ''Only if radio button is set to yes indicating the destination terminal is different than the port of discharge.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/Container#Actual_Delivery_Date Actual delivery date] or [http://ct.jaguarfreight.com/wiki/CT_bo#Delivery_Comment delivery comment]. | ||
+ | |||
+ | ==== LCL shipments ==== | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Notification_Date Notification date]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Actual_Export_Pick_Up_Date Actual export pickup date]. ''Only if the estimated export pickup date is entered.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Origin_Terminal_Actual_Date Origin terminal actual date]. ''Only if radio button is set to yes indicating it would differ from Port of Loading actual date.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Port_Of_Loading_Actual_Date Port of loading actual date]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Trans_Shipment_Actual_Date Port of trans-ship actual date]. ''Only if check box is checked indicating this record has a trans-shipment point.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Port_Of_Discharge_Actual_Date Port of discharge actual date]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Destination_Terminal_Actual_Date Destination terminal actual date]. ''Only if radio button is set to yes indicating the destination terminal is different than the port of discharge.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Actual_Delivery_Date Actual delivery date] or [http://ct.jaguarfreight.com/wiki/CT_bo#Delivery_Comment delivery comment]. | ||
+ | |||
+ | ==== Air shipments ==== | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Notification_Date Notification date]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Actual_Export_Pick_Up_Date Actual export pickup date]. ''Only if the estimated export pickup date is entered.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Airport_Of_Departure_Actual_Date Airport of departure actual time of departure]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Trans_Shipment_Actual_Date Trans-shipment airport actual time of departure]. ''Only if check box is checked indicating this record has a trans-shipment point.'' | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Airport_Of_Destination_Actual_Date Airport of destination actual time of arrival]. | ||
+ | * [http://ct.jaguarfreight.com/wiki/CT_bo#Actual_Delivery_Date Actual delivery date] or [http://ct.jaguarfreight.com/wiki/CT_bo#Delivery_Comment delivery comment]. | ||
+ | |||
+ | ==== Trucking shipments ==== | ||
+ | ''NOTE: Validations of Trucking CT dates will be specified later in separate mantis.'' | ||
== Architect Review == | == Architect Review == |
Current revision as of 10:42, 1 February 2011
Contents |
[edit] Info
- mantis 0002413: [Ops Misc Dates] Date Validation
[edit] Requirements and Solutions
- Task type: Tweak.
- Where: Actual CT Dates.
- What: System should validate the chronological order in the specific sequence for all actual dates.
- The system must allow each of the dates to be the same as the previous date or more.
- If an attempt is made to confirm a date out of order an error message should be generated and the date should not be saved.
- Generalized example of error message: <Next date> cannot be confirmed until <previous date> has been confirmed in <CT #XXXXXX>.
- Specific example of error message: Actual arrival date cannot be confirmed until actual departure date has been confirmed.
- CT # should be indicated in the error message:
- 1) If CT is a part of Group and date field what out of order is selected for "Group save".
- 2) If CT is a part of Master.
- NOTE: Validations of estimated dates are no longer required.
[edit] Specific sequence of validating dates
- Specific sequence of validating dates is conditioned on the set of events the shipment.
- Each event corresponds to the date of shipment depending on the mode of transport:
[edit] FCL shipments
- Notification date.
- Actual collection date. Only required to be filled in if an estimated collection date is filled in.
- Origin terminal actual date. Only required if radio button is set to yes indicating the origin terminal is different from the port of loading.
- Port of loading actual date.
- Port of trans-ship actual date. Only if check box is checked indicating this record has a trans-shipment point.
- Port of discharge actual date.
- Destination terminal actual date. Only if radio button is set to yes indicating the destination terminal is different than the port of discharge.
- Actual delivery date or delivery comment.
[edit] LCL shipments
- Notification date.
- Actual export pickup date. Only if the estimated export pickup date is entered.
- Origin terminal actual date. Only if radio button is set to yes indicating it would differ from Port of Loading actual date.
- Port of loading actual date.
- Port of trans-ship actual date. Only if check box is checked indicating this record has a trans-shipment point.
- Port of discharge actual date.
- Destination terminal actual date. Only if radio button is set to yes indicating the destination terminal is different than the port of discharge.
- Actual delivery date or delivery comment.
[edit] Air shipments
- Notification date.
- Actual export pickup date. Only if the estimated export pickup date is entered.
- Airport of departure actual time of departure.
- Trans-shipment airport actual time of departure. Only if check box is checked indicating this record has a trans-shipment point.
- Airport of destination actual time of arrival.
- Actual delivery date or delivery comment.
[edit] Trucking shipments
NOTE: Validations of Trucking CT dates will be specified later in separate mantis.