Core:  Enable accounting to “close out” the month end, at the actual end of each month, based on estimated charges.  In order to achieve this we will follow the below.
Core:  Enable accounting to “close out” the month end, at the actual end of each month, based on estimated charges.  In order to achieve this we will follow the below.
*Pull the estimated sell rate from a database to be entered under the client profile (to be handled on phase 2)
*Pull the estimated sell rate from a database to be entered under the client profile (to be handled on phase 2)
-
*Pull cost form a database (to also be handled in phase 2)  
+
**If nothing in to database matches the required information(TBA defined in Phase 2)the system should automatically calculate the estimated sell by:
-
*we will require operators to enter estimated sales and costs at the required point of revenue recognition.
+
***Pull cost form a database (to also be handled in phase 2) and add 15% to it.  The total of the (cost x 15%)+ cost - Work around for Phase one - Operators should manually enter cost.  The sell should be based on the above calculation.
 +
*Operators will need to be able to edit these estimates and add additional.
===Point Of Revenue Recognition===
===Point Of Revenue Recognition===
-
For Ocean LCL and FCL Shipments [[#Origin Terminal Actual Date]]  
+
For Ocean LCL and FCL Shipments [[#Port Of Loading Actual Date]]  
For Air shipments [[#Airport Of Departure Actual Date]]
For Air shipments [[#Airport Of Departure Actual Date]]

Revision as of 22:00, 30 November 2010


Contents

PARENT MANTIS

0002515: [Estim P&L] .......<proj>

REQUIREMENTS

Core: Enable accounting to “close out” the month end, at the actual end of each month, based on estimated charges. In order to achieve this we will follow the below.

  • Pull the estimated sell rate from a database to be entered under the client profile (to be handled on phase 2)
    • If nothing in to database matches the required information(TBA defined in Phase 2)the system should automatically calculate the estimated sell by:
      • Pull cost form a database (to also be handled in phase 2) and add 15% to it. The total of the (cost x 15%)+ cost - Work around for Phase one - Operators should manually enter cost. The sell should be based on the above calculation.
  • Operators will need to be able to edit these estimates and add additional.

Point Of Revenue Recognition

For Ocean LCL and FCL Shipments #Port Of Loading Actual Date

For Air shipments #Airport Of Departure Actual Date

For Truck shipments #Actual Export Pick Up Date



Estimated Cost

should reflect:

  • Dollar Amount
  • Vendor
  • Currency
  • Charge Code
  • Charge Code Description

Estimated Sell

should reflect:

  • Bill To Party
  • Dollar amount
  • Currency

Automatic x% increase to cost details to be defined

Reports

  • Should be able to generate a report showing both estimated cost/sell and actual cost/sell
  • The report should be per CT record
  • should be within a selected time frame
  • should able to download to excel

Requirements to be defined



DESIGN IDEAS

These charges will be entered in on a separate Tab Est., as per examples below

Once these charges are entered into this Estimation invoice – It should then pull through and show on the P/L tab.


File:Enter estimated charges on tab.JPG File:Estimation calculated.JPG File:Pl estimation screen.JPG


DETAILED DESIGN

HISTORY

0002565: [Estim P&L] Complete Requirements / Design Ideas wiki sections