AN ORIGINAL KPIs for OpsTruck (concepts and requirements)

From UG

(Difference between revisions)
Jump to: navigation, search
(Glossary)
(SA Notes)
Line 102: Line 102:
== SA Notes ==
== SA Notes ==
-
=== Formulas ===
+
=== Formulas and mapping for Cost KPIs ===
 +
 
 +
Total cost:
 +
 
 +
Total cost for day X = Cost of all loads delivered on day X
 +
 
 +
Cost per pound:
  Cost per pond for load = (cost of load) / (weight of load in pounds)  
  Cost per pond for load = (cost of load) / (weight of load in pounds)  
-
  Average Estimated Cost Per Pound of Arden Domestic Trucking Operation in November
+
  Cost Per Pound for day X
-
     = Cost of all loads handled in November / total weight of these loads
+
     = Cost of all loads delivered on day X / total weight of these loads
  Average Estimated Cost Per Pound of YRC in November  
  Average Estimated Cost Per Pound of YRC in November  
     = Cost of all loads handled in November by YRC / total weight of these loads
     = Cost of all loads handled in November by YRC / total weight of these loads
 +
 +
 +
=== Formulas and mapping for Time KPIs ===
 +
 +
All numbers below should have 2 decimals.
 +
 +
KPIs below are measures in time elapsed (in days) between 2 dates in the system.
 +
 +
For dates that may be set and re-set use earliest or lates date - whichever is available in the system. Example: for '''Created to Hold''' - measure from created to first/last time on hold.
 +
 +
* '''Created to Approved'''
 +
* '''Created to Hold''' - from created to first time on hold
 +
* '''Approved to Routed'''
 +
* '''Routed to Pick Up'''
 +
* '''Pick up to Delivery'''
 +
 +
'''On hold''' - time elapsed (in days) during which CT has "On hold" status.
 +
 +
Mapping:
 +
 +
* '''Created''' - [[CT#Created On Date]]
 +
* '''Approved''' - [[CT#Approved On]]
 +
* '''Hold'''
 +
* '''Routed''' - timestamp when [[CT#Pick Up Trucker]] or [[CT#Delivery Trucker]] is set
 +
* '''Pick Up''' - [[CT#Actual Export Pick Up Date ]]
 +
* '''Delivery''' - [[CT#Actual Delivery Date]]
== History ==
== History ==

Revision as of 20:52, 22 November 2010


Contents

Parent Mantis

2488: [Arden KPI]......... <proj>

Requirements

Glossary

Core need

It is to provide a number of KPIs for Arden management for Arden Trucking Project

Phase 1

We agreed to provide the following KPIs for Phase 1:

  • Cost:
    • Cost per pound
    • Total cost
  • Time:
    • Created to Approved
    • Created to Hold
    • Approved to Routed
    • Routed to Pick Up
    • Pick up to Delivery
    • On hold

Design

Drill down. Should have several levels. Start at a top level (on a dashboard level with a minimal info) and be able to drill down to more finite details (down to the load / CT).

Standardization. For every KPI approach to UI design should be similar in principle and as standard as possible.

Report types. For every KPI provide the following report types:

  • dashboard version
  • KPI as a function of time
  • KPI as a function of various variables such as CT fields (examples: Carrier, Shipper, Origin State, etc)
    • bar layout
    • pie layout
    • map layout

Filters. Provide set of standard filters. Ideally every CT field should be represented by a multiselect filter.

Fields on CT/Load version. On this type of report ideally:

  • list columns should cover all CT fields
  • user should be able to manage order of columns and what columns are included and what are excluded

Personalization. Some settings should be configured in a user or / and Client profile. Example: some users might want to see year-to-date cost on a dashboard and some month-to-date cost.

Design Ideas

Level 1: Dashboard

File:Dashboard.JPG

If user clicks on any number on dashboard system will take it to the Level 2

Level 2: Axis X is time

File:Level 2 Axis X is time.JPG

If user clicks on any specific area of the plot then system will take user to the Level 3 and display information related to that area.

Level 2: Axis X is Selected Carriers and Report type is Bar Chart

File:Level 2 Axis X is Selected Carriers and Report type is Bar Chart.JPG

If user clicks on any specific area of the plot then system will take user to the Level 3 and display information related to that area. For example if user clicks on UPS bar then on Level 3 we will see only UPS loads.

Level 2: Cost per pound Axis X is Selected Shippers and Report type is Map

File:Level 2 Cost per pound Axis X is Selected Shippers and Report type is Map.JPG

Level 3: Load and CT level

File:Level 3 Load and CT level.JPG

Cost per pound analysis

See Cost per pound analysis

Total cost analysis

See Total cost analysis

Average times

See Average times

Maps

See Maps

SA Notes

Formulas and mapping for Cost KPIs

Total cost:

Total cost for day X = Cost of all loads delivered on day X 

Cost per pound:

Cost per pond for load = (cost of load) / (weight of load in pounds) 
Cost Per Pound for day X
   = Cost of all loads delivered on day X / total weight of these loads
Average Estimated Cost Per Pound of YRC in November 
   = Cost of all loads handled in November by YRC / total weight of these loads


Formulas and mapping for Time KPIs

All numbers below should have 2 decimals.

KPIs below are measures in time elapsed (in days) between 2 dates in the system.

For dates that may be set and re-set use earliest or lates date - whichever is available in the system. Example: for Created to Hold - measure from created to first/last time on hold.

  • Created to Approved
  • Created to Hold - from created to first time on hold
  • Approved to Routed
  • Routed to Pick Up
  • Pick up to Delivery

On hold - time elapsed (in days) during which CT has "On hold" status.

Mapping:

History

Original ver

http://mantis.jaguarfreight.com/mediawiki-1.15.0/index.php?title=BI_and_KPIs_for_OpsTruck&oldid=16496

Rewrite based on feedback from Simon and Marc

Links to old designs:

See Cost per pound analysis

See Total cost analysis

See Average times

See Maps

Personal tools