AN ORIGINAL KPIs for OpsTruck (concepts and requirements)
From UG
(Difference between revisions)
m (moved BI and KPIs for OpsTruck to KPIs for OpsTruck phase 1) |
(→Parent Mantis) |
||
Line 3: | Line 3: | ||
== Parent Mantis == | == Parent Mantis == | ||
- | + | 2488: [Arden KPI]......... <proj> | |
== Requirements == | == Requirements == |
Revision as of 17:52, 22 November 2010
Contents |
Parent Mantis
2488: [Arden KPI]......... <proj>
Requirements
There are number of reports required. See below.
The concept is to make them layered: to start at a top level and be able to drill down to more finite details.
Design Ideas
Cost per pound analysis
Total cost analysis
Average times
See Average times
Maps
See Maps