AN ORIGINAL KPIs for OpsTruck (concepts and requirements)
From UG
(Difference between revisions)
(→Average times) |
(→Design Ideas) |
||
Line 24: | Line 24: | ||
See [[Average times]] | See [[Average times]] | ||
- | |||
=== Maps === | === Maps === |
Revision as of 21:25, 17 November 2010
Contents |
Parent Mantis
2489 0002489: [BI / KPI] (BA) create proposal for Arden
Requirements
There are number of reports required. See below.
The concept is to make them layered: to start at a top level and be able to drill down to more finite details.
Design Ideas
Cost per pound analysis
Total cost analysis
Average times
See Average times
Maps
See Maps