CT2 Resources Demand Supply Allocation

From UG

(Difference between revisions)
Jump to: navigation, search
(Metrics)
 
(17 intermediate revisions not shown)
Line 1: Line 1:
[[Category:PM (public)]]
[[Category:PM (public)]]
 +
 +
== General Info ==
This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.
This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.
We need to build smart Supply Chain for Software Development!  ))
We need to build smart Supply Chain for Software Development!  ))
 +
 +
* parent mantis: http://mantis.jaguarfreight.com/mantis/view.php?id=2054
 +
 +
== 2009 Forecast spreadsheet ==
 +
 +
See spreadsheet attached to http://mantis.jaguarfreight.com/mantis/view.php?id=2054
== Metrics ==
== Metrics ==
Line 34: Line 42:
20 h per week ~ 80 per month
20 h per week ~ 80 per month
-
 
-
 
-
=== FTL ===
 
-
 
-
It is proposed to use '''ftl''' (full time load) unit of measurement. This is to measure demand for IT staff (SAs, BAs, developers, QAs, Support Engineers).
 
-
 
-
 
-
==== full load ====
 
-
 
-
* 1 ftl (full load)
 
-
:: if average numb of hours required: 30 to 40 per week ~ 120-160 per month
 
-
 
-
==== medium load ====
 
-
 
-
* 3/4 ftl (med load)
 
-
:: if average numb of hours required:  20 to 30 per week ~ 80-120 per month
 
-
 
-
==== low load ====
 
-
 
-
* 1/2 ftl (low load)
 
-
:: if average numb of hours required:  10 to 20 per week ~ 40-80 per month
 
-
 
-
==== very low load ====
 
-
 
-
* 1/4 ftl (very low load)
 
-
:: if average numb of hours required:  1 to 10 per week ~ 4-40 per month
 
== 2010 June to December Forecast ==
== 2010 June to December Forecast ==
Line 71: Line 53:
** emh high = 10 per week
** emh high = 10 per week
-
* project 1) Re-design cost mapping and P&L for CTs, Groups, Masters
+
* project: ''P&L Re-design''
 +
** Re-design cost mapping and P&L for CTs, Groups, Masters
** emh = TBD
** emh = TBD
** deadline: asap
** deadline: asap
-
* project 2) see [[:Category:Salesman]]
+
* project ''Salesman module''
 +
** see [[:Category:Salesman]]
** emh = TBD
** emh = TBD
** deadline: asap
** deadline: asap
Line 85: Line 69:
** emh high = 30 per week
** emh high = 30 per week
-
* project 1) see #0001707 Replace Skype with our own Instant Messaging feature
+
* project: ''IM feature''
 +
** see #0001707 Replace Skype with our own Instant Messaging feature
** emh = TBD
** emh = TBD
** deadline: asap
** deadline: asap
-
* project 2) see #0001999 Create Agent Interface component/application
+
* project: ''Agent Interface''
 +
** see #0001999 Create Agent Interface component/application
** emh = TBD
** emh = TBD
** deadline: asap
** deadline: asap
Line 99: Line 85:
** emh high = 40 per week (could be even more)
** emh high = 40 per week (could be even more)
-
* projects:  TBD
+
* project:  TBD
** emh = TBD
** emh = TBD
Line 108: Line 94:
** emh high = 20 per week (will be getting lower soon)
** emh high = 20 per week (will be getting lower soon)
-
* projects:  TBD
+
* project:  TBD
** emh = TBD
** emh = TBD
Line 117: Line 103:
** emh high = 30 per week (will be lower if no new reports requested)
** emh high = 30 per week (will be lower if no new reports requested)
-
* projects: #0001998  Have all CT fields available on all CT reports
+
* project: ''All fields''
 +
** #0001998  Have all CT fields available on all CT reports
** emh = TBD
** emh = TBD
=== New Modules ===
=== New Modules ===
-
==== Integration with TMS ====
+
==== TMS Integration ====
Jaguar is planning to purchase a large TMS system that has to be integrated with CT2. This would mean:
Jaguar is planning to purchase a large TMS system that has to be integrated with CT2. This would mean:
Line 129: Line 116:
* Estimates
* Estimates
-
** start: mid June
+
** start: June-Aug
-
** length: 1-3 month
+
** length low: 1 month
-
** emh low = 20 per week
+
** length high: 3 month
 +
** emh low = 30 per week
** emh high = 40 per week
** emh high = 40 per week
-
==== Trucking Domestic Optimization (TMS features) ====
+
==== CT2 TMS features (Trucking Domestic Optimization) ====
Jaguar plans to add a number of complex TMS features to CT2
Jaguar plans to add a number of complex TMS features to CT2
Line 140: Line 128:
* Estimates
* Estimates
** start: July-September
** start: July-September
-
** length: 6-12 months
+
** length low: 6 month
 +
** length high: 12 month
** emh low = 20 per week
** emh low = 20 per week
** emh high = 40 per week
** emh high = 40 per week
Line 150: Line 139:
* Estimates
* Estimates
** start: July-September
** start: July-September
-
** length: 2-3 months
+
** length low: 2 month
 +
** length high: 3 month
** emh low = 20 per week
** emh low = 20 per week
-
** emh high = 40 per week
+
** emh high = 30 per week
==== EDI ====
==== EDI ====
-
Jaguar plans to integrate with Clients, Vendors, etc through EDI (for example receive Traffic Sheets, send Invoices)
+
Jaguar plans to integrate with Clients, Vendors, etc through EDI (for example receive Traffic Sheets, send Invoices). Please note that there many companies Jaguar interface so if this is successful then EDI could be a constant task.
* Estimates   
* Estimates   
** start: asap
** start: asap
-
** length: TBD
+
** length low: 2 month
 +
** length high: 12 month
** emh low = 20 per week
** emh low = 20 per week
** emh high = 40 per week
** emh high = 40 per week
Line 169: Line 160:
* Estimates
* Estimates
-
** start: TBD
+
** start: July - Aug
-
** length: TBD
+
** length low: 6 month
 +
** length high: 12 month
** emh low = 20 per week
** emh low = 20 per week
** emh high = 40 per week
** emh high = 40 per week
Line 180: Line 172:
* Estimates
* Estimates
** start: asap
** start: asap
-
** length: TBD
+
** length low: 2 month
 +
** length high: 4 month
 +
** emh low = 20 per week
 +
** emh high = 40 per week
 +
 
 +
==== Help system ====
 +
 
 +
We need "help system" for CT2
 +
 
 +
Mantis: 2087 (CT2 Help System) http://mantis.jaguarfreight.com/mantis/view.php?id=2087
 +
 
 +
* Estimates
 +
** Start: when resources have free time
 +
** Prio-ty: low
 +
** start: asap
 +
** length low: 2 month
 +
** length high: 4 month
** emh low = 20 per week
** emh low = 20 per week
** emh high = 40 per week
** emh high = 40 per week
Line 195: Line 203:
Both options would increase numb of hours required in Remote Team
Both options would increase numb of hours required in Remote Team
 +
 +
== History ==
 +
=== Ver 1 ===
 +
completed.

Current revision as of 07:54, 5 July 2010


Contents

[edit] General Info

This article is about Demand for CT2 features and related Supply / Allocation of Human Resources.

We need to build smart Supply Chain for Software Development! ))

[edit] 2009 Forecast spreadsheet

See spreadsheet attached to http://mantis.jaguarfreight.com/mantis/view.php?id=2054

[edit] Metrics

[edit] Assumptions

  • One full time employee works 8 m/h a day ~ 40 m/h a week ~ 160 m/h a month
  • One Sprint ~ One month

[edit] Types of load

There are 2 types of activities:

  • continuous: bugfix, tweaking (small to medium changes)
  • projects

[edit] FTD

FTD = full time developer

[edit] 1 FTD

40 h per week ~ 160 per month

[edit] 1/4 FTD

10 h per week ~ 40 per month

[edit] 1/2 FTD

20 h per week ~ 80 per month

[edit] 2010 June to December Forecast

[edit] Existing modules

[edit] Acc Component

  • continuous bug-fix/tweaking:
    • emh low = 5 per week
    • emh high = 10 per week
  • project: P&L Re-design
    • Re-design cost mapping and P&L for CTs, Groups, Masters
    • emh = TBD
    • deadline: asap

[edit] Client Component

  • continuous bug-fix/tweaking:
    • emh low = 10 per week
    • emh high = 30 per week
  • project: IM feature
    • see #0001707 Replace Skype with our own Instant Messaging feature
    • emh = TBD
    • deadline: asap
  • project: Agent Interface
    • see #0001999 Create Agent Interface component/application
    • emh = TBD
    • deadline: asap

[edit] Ops Component

  • continuous bug-fix/tweaking:
    • emh low = 20 per week
    • emh high = 40 per week (could be even more)
  • project: TBD
    • emh = TBD

[edit] Ops Pdfs Component

  • continuous bug-fix/tweaking:
    • emh low = 10 per week (will be getting lower soon)
    • emh high = 20 per week (will be getting lower soon)
  • project: TBD
    • emh = TBD

[edit] Ops Reps Component

  • continuous bug-fix/tweaking:
    • emh low = 10 per week (will be getting lower soon)
    • emh high = 30 per week (will be lower if no new reports requested)
  • project: All fields
    • #0001998 Have all CT fields available on all CT reports
    • emh = TBD

[edit] New Modules

[edit] TMS Integration

Jaguar is planning to purchase a large TMS system that has to be integrated with CT2. This would mean:

  • supporting real time integration / flow of data between 2 systems (one or both directions)
  • potentially adding additional fields and features to support above
  • Estimates
    • start: June-Aug
    • length low: 1 month
    • length high: 3 month
    • emh low = 30 per week
    • emh high = 40 per week

[edit] CT2 TMS features (Trucking Domestic Optimization)

Jaguar plans to add a number of complex TMS features to CT2

  • Estimates
    • start: July-September
    • length low: 6 month
    • length high: 12 month
    • emh low = 20 per week
    • emh high = 40 per week

[edit] Rates Interface

Jaguar plans to add Rates Interface.

  • Estimates
    • start: July-September
    • length low: 2 month
    • length high: 3 month
    • emh low = 20 per week
    • emh high = 30 per week

[edit] EDI

Jaguar plans to integrate with Clients, Vendors, etc through EDI (for example receive Traffic Sheets, send Invoices). Please note that there many companies Jaguar interface so if this is successful then EDI could be a constant task.

  • Estimates
    • start: asap
    • length low: 2 month
    • length high: 12 month
    • emh low = 20 per week
    • emh high = 40 per week

[edit] Inventory Management

Jaguar plans to create Inventory Management components (as a CT2 feature or stand alone application)

  • Estimates
    • start: July - Aug
    • length low: 6 month
    • length high: 12 month
    • emh low = 20 per week
    • emh high = 40 per week

[edit] www.jaguarfreight.com website re-design

Jaguar plans to integrate with Clients, Vendors, etc through EDI (for example receive Traffic Sheets, send Invoices)

  • Estimates
    • start: asap
    • length low: 2 month
    • length high: 4 month
    • emh low = 20 per week
    • emh high = 40 per week

[edit] Help system

We need "help system" for CT2

Mantis: 2087 (CT2 Help System) http://mantis.jaguarfreight.com/mantis/view.php?id=2087

  • Estimates
    • Start: when resources have free time
    • Prio-ty: low
    • start: asap
    • length low: 2 month
    • length high: 4 month
    • emh low = 20 per week
    • emh high = 40 per week

[edit] Etc

[edit] Misc

[edit] Development based on Requirements not Detailed Design

2 possible options:

  • Remote Developer (programmer) creates detailed design based on requirements
  • Remote Designer creates detailed design based on requirements

Both options would increase numb of hours required in Remote Team

[edit] History

[edit] Ver 1

completed.

Personal tools